203-SIMPLIFIED Flashcards
SCOPE OF SERVICES OF FULL-TIME SUPERVISION SERVICES
a. Quality Control
b. Evaluation of Construction Work
c. Preparation of Daily Inspection Reports
d. Filing of documents
Two ways an Architect may enter into a
contract with the Owner (Full-time Supervision Services)
- Working in a dual capacity as
Architect-of-record and as Consulting
Architect for full-time supervision
services or as the Construction
Supervision Group (CSG). - Working as a Consulting Architect
for full-time supervision services
only or as the CSG.
interpret drawings and documents and to assure conformity by the Contractor. Can assign staffs to undertake the full-time supervisory work under his guidelines.
AoR Architect of Record
Construction Supervision Group (CSG) -
responsible to the Owner only for
_____________.
administrative matters
The CSG is responsible to the Architect-of-record (Aor) for ______________.
technical matters
Under article 1723 of present civil code
the CSG may appear not to have any
legal responsibility.
Architect-of-record (Aor) and
Engineers-of-record (Eors) are responsible
for the ________, while the Contractor is
responsible for the _______.
DESIGN, CONSTRUCTION
If the CSG review the Contract documents
and the course of construction, ________ may stipulate certain professional responsibilities and civil liabilities of the CSG.
Service Contract/Agreement
If the Aor (and Eors) and the Contractor are
sued by an Owner for civil liabilities due to
acts traceable to the CSG
the Aor and Eors may file cross claims against the CSG
The Construction Manager (CM) could either
be:
a. a member of the staff of the Owner,
b. an independent individual,
c. a firm hired by the Owner to manage
the construction of a particular
project.
TRUE OR FALSE
The Architect can serve as the Construction
Manager (CM)
TRUE, His training of different
specialties allows him to monitor all
construction activities regarding quality,
workmanship and cost.
Based on __________ and ________, The roles of the Construction Manager (CM)
include the functions of the Construction
Supervision Group (CSG).
a. Coordination and Supervision
b. Cost and Time Control
c. Quality Control of Work
d. Keeping of Records
Doc.204-A and Architect’s Guidelines
T OR F
The Construction Manager (CM) may hire
the CSG to be under his employ or may
supervise the CSG hired directly by the
Owner.
TRUE
The Architect as the Construction Manager
shall not:
_________ directly with the work of the
Contractor to prevent his liability to the
Contractor
Involve himself
The Architect as the Construction Manager
(CM) is directly responsible to the Owner _____________
on all aspects of the construction work
The channels of communication are kept
open among the building owners, operators,
professionals, and other groups and
administrators involved in the project to
provide information about the performance
and upkeep of buildings.
POST CONSTRUCTION SERVICES
analyze and give solutions to the
deficiencies and failures of the
building
FORENSIC INVESTIGATION
a. evaluate the initial design program vs.
the actual use of the facility;
b. determine the effectiveness of the
building systems and the materials;
POST-CONSTRUCTION EVALUATION
refers to the range of professional services
from Pre-design services to Post-Construction Services
COMPREHENSIVE ARCHITECTURAL
SERVICES
The Architect renders professional services
in the implementation of his design
DESIGN BUILD
In __________ , he assumes the
professional responsibility and civil liability
for both the design and the construction of
the project
Design-Build Services
SPPCC
STATEMENT OF PROBABLE PROJECT CONSTRUCTION COST
same as Design-Build Services by Administration *except that the
Owner/ Client is provided a guaranteed maximum project construction cost for the construction of the project.
DESIGN-BUILD SERVICES WITH
GUARANTEED MAXIMUM PROJECT
CONSTRUCTION COST
The Owner/ Client is given an
estimate of the project, and if there is
an excess amount from the estimated
project construction cost; ______
it is divided equally between the Owner/ Client and the Architect.
The project construction cost should
not ___________ of the
estimated construction cost. If exceeded, the Architect is liable for the excess amount but only up to the amount of his administration Fee.
exceed Ten Percent (10%)
When there is additional
expenditures beyond the guaranteed
maximum project construction cost
due to legitimate change/variation
orders (CVOs), extra work orders
(EWOs), escalation of costs of
materials and labor with evidence
the additional costs shall be borne by the Owner/ Client
state the principles upon which
competitions are based and by which
Promoters/ Owners should be guided in
organizing ADCs. It interests both Project
Proponents/ Owners and Competitors
ARCHITECTURAL COMPETITION
state the principles upon which
competitions are based and by which
Promoters/ Owners should be guided in
organizing ADCs. It interests both ________________________
Project Proponents/ Owners and Competitors