200 - Winter Ops. Flashcards
Subfreezing weather Hydrant Insp.’s
BC’s shall cause Insp.’s to be made of the following:
4.6.3
“D.C.-P.L.U.G.”
D efective Drain - Not repaired C onstr./Demo. Site P lugged Drains = "P" L I.P.L. Valve Pits subject to freezing U sed in past 24 hours G round water a problem
EXCEPT WHERE OTHERWISE SPECIFICALLY NOTED, activities outlined herein (Winter Ops) shall commence on:
3
October 1st of each year
As part of preplanning, Boro CMDS & SOC ensure that each Div. and Bn has a ??
3.2.1
Winter Ops. Coord.
CMDS shall maintain a list of coord’s. This list shall be maintained current as of October 1st of each year.
Preplanning
Div & Bn Winter Ops. Coord’s shall initiate & arrange ctc with various agencies (e.g. D.S., P.D.)
3.3.1.A, B
- If poss, duplication of ctc’s avoided; Div & Bn coord’s shall keep one another informed of their activities in this regard.
- A log of ctc’s (names & phone #’s) & their results maintained in each Div & Bn office for reference by all Chiefs.
- Names & phone #’s for the OEM WATCH CMD AND FD LIAISON ASSIGNED TO OEM’s E.O.C. (when activated) shall be written in log.
Div, Bn and Units shall compile a listing of primary response routes for snow & obstruction clearance. Lists shall be forwarded to:
3.3.2.A
PLANNING AND STRATEGY UNIT (OEM Liaison), who will work with OEM to provide this Info to the Dept. of Sanitation.
Division Coord. Survey Responsibilities
3.3.2.B,C,D
- DET loc’s of poss sites where addl. units could be established during EMER’s
- Initiate surveys to DET loc. of LARGE LIFE HARBORING INSTITUTIONS IN REMOTE AREAS OR REQUIRING SP. OPERATING PROCEDURES during snow EMER’s
- ## Initiate survey to DET areas where sp. water supply problems likely during freezing or snow EMER’s and where necessary, develop alt. methods of water supply.
Equip. Assembled in readiness AND placed on rig when snow or ice EMER is IMMINENT OR PHASE A OR B ESTABLISHED:
3.3.3.D
“C.V.S. - 6 2 T.”
C ontainers ~ salt & sand
V eh. Recovery strap w/shackle
S pecial Hyd Connect s/u AS DET’d BY CMDG OFF’s
6 EXTRA 2-1/2” lengths of hose ~ AT LEAST
2 Shovels
T ire chains/spare links & link tool
- THE ABOVE EQUIP. ALSO ASSEMBLED & READY FOR USE ON RESERVE APPARATUS.
What tools & equip. Should be placed in Chief’s Veh. when snow or ice EMER is IMMINENT OR PHASE A OR B ESTABLISHED:
3.3.3.E
“V.E.S.T.”
V eh. Recovery strap
E xtinguishers
S hovels
T ire chains
Who competes the “Winter Checklist Form” & where is it fwd’d?
3.3.3.H
BC’s shall complete the Winter Checklist Form and FWD A COPY TO THE DIV. COORD.
Div. & Bn COORD’s shall schedule MUD & co. Drills to address the following:
3.3.4.C
“W.O.R.L.D.”
W ater supply problems
O ps. Involving dead end streets & cul-de-sacs
R emote loc’s
L ocal sp. problems
D eployment of resources at scene, compensating for delays in response of addl. units
Drills & training schedules concerning winter ops initiated during???
3.3.4.E
Month of October each year
Regarding prospective hydrant/water supply problem areas, who should ctc whom IN MAPPING AFFECTED AREAS?
3.3.5.A
COORDINATORS (Bn or Unit??) should ctc the GEOGRAPHIC INFORMATION SYSTEM (G.I.S.) for assistance in mapping affected areas.
In regards to hyd’s having defective drainage assy’s or a history of freezing problems, what should BN COORD’s do?
3.3.5.B
Bn coord’s should maintain a current history of these hyd’s, to permit proper scheduling & use of T.A. In periods of freezing weather.
- BC’s SHALL REQUEST T.A. THRU CHAIN OF CMD!!
Agree or disagree:
Chief Officers shall consider the use of fire boats as a source of water supply AT OTHER THAN BOAT BOXES.
3.3.5.C
Agree
Who designates the Div/Bn Winter Ops COORD?
3.3.6.A
Each Div & Bn CMDR shall designate a Winter Ops. COORD.
- Coord’s ctc FDNY OEM liaison in PLANNING & STRATEGY UNIT for up to date info.
- DURING NON-BUSINESS HOURS, OEM LIAISON CAN BE CTC’d VIA FDOC.
Div & Bn coord’s shall initiate activities of this AUC on:
3.3.6.B
October 1st each year, EXCEPT WHERE SPECIFICALLY NOTED, to continue for duration of the winter season.
Who DET’s special needs for winter ops & requisitions or obtains such supplies & equip in advance of winter weather? When does the requisitioning commence?
3.3.7.A
Co. CMDR; July 1st
Items not rec’d by _______ shall be called to the attn of ______?
3.3.7.A
October 1st; DIV COORD
__________ shall maintain __________ in qtrs for snow clearance I/f/o qtrs and for Hyd clearance thru out their admin districts.
3.3.8.C
Co. CMDR; A MINIMUM OF 6 SHOVELS
Sub-freezing weather conditions
4.6.1
25 degrees or less for a 24 hour period
- Div institute an insp. & corrective action program to I.D. & thaw frozen hyd’s.