19.5 job costing and spoilage Flashcards
1
Q
normal spoilage costs in job costin systems as in process costing systems are
A
inventoriable costs
2
Q
the costs of abnormal spoilage are
A
not inventoriable costs and are written off as costs of the accounting period in which the abnormal spoilage is detected
3
Q
when assigning costs, job costing systems distinguish among spoilages in 3 ways
A
- normal spoilage attributable to a specific job
- normal spoilage common to all jobs
- abnormal spoilage