13. Design for manufacture and Project Management Flashcards

1
Q

What is quality control?

A

Monitoring, checking and testing procedures used throughout production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What is quality assurance?

A

Procedures and policies which enusre that products meet specifications criteria.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are some examples of quality assurance procedured and policies?

A
  • Checking correct temperature
  • cutter maintenance shedules
  • pre productions CAD modelling
  • FEA
  • CFD
  • Mould flow analyis
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is total quality management (TQM)?
(PMS)

A

A system to improve QA by harnessing workforce expertise.
- reduce waste, make products right the first time.
- workforce views feedback and communcations are highly prioritised.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is scrum?
(PMS)

A

Use of workforce teams to respond quickly to product desing and manufacture.
- Main focus is to work in a team to reach goals in a short timescale.
- Teams goals are specifies and fedback progress at daily update meetings - responding to issues

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is a Project Management System?

A

Systems to improve effienciency and reduce waste.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the six sigma
(PMS)

A

System for process improvement to reduce defects to fewer than 3.4 in every million
- Procedure monitors , assessed and improved each stage of desing and manufacture.
DMAIC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What are the 5 key stages of the six sigma?
(PMS)

A

D efine the issure requiring improvement
Measure the extent of the issue
Analyse where the measured issue occur
Improve by intorducing rectifications procedures
Control the modified procedures through effective QA

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is Critical Path Analysis?

A

Analysis of stages in a project to ensure time efficient completion.
- unnecessary waiting times can be identified
- Parallel processing oppurtunites can be exploited for max efficinecy.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What are some quality control techniques?

A

Monitoring, checking and testing
Tolerance
Digital measuring devices

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What are specific Quality control methods?

A

go/no go gauge
Laser or probe scnning
Digital measuring devices
NDT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What is the Go/No go gauge

A
  • These check single measurement for tolerance range with pass or fail reading
  • Made with minimum and maximum dimensions so it is easy to read
  • quicker than vernier
  • no need for adjustments
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

How do Laser ot Probe scanning and measuring work?

A
  • Co ordinate Measuring Machinery can be used
  • Highly accurate
  • CMM checks tooling accuracy
  • can scan thousand of reading per second.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What are digital measuring devices?

A

Digital vernier caliper and micrometers
- Dimensional accuracy
- Flexible measuring tools

How well did you know this?
1
Not at all
2
3
4
5
Perfectly