What covers Damage Mechanisms Affecting Fixed Equipment in the Refining Industry?

1 RP 578
2 RP 576
3 RP 571
4 Publ 581

A

RP 571

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What covers Inspection of Pressure Vessels?

RP 571
RP 578
RP 572
RP 576

A

RP 572

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What covers Inspection of Pressure-Relieving Devices

RP 571
RP 578
RP 572
RP 576

A

RP 576

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What covers Welding Inspection and Metallurgy?

RP 571
RP 577
RP 572
RP 576

A

RP 577

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What covers Material Verification Program for New and Existing Alloy Piping Systems?
RP 571
RP 578
RP 572
RP 576

A

RP 578

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What covers Fitness-For-Service?

RP 579
RP 578
RP 572
RP 576

A

RP 579

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What covers Risk-Based Inspection?

RP 571
RP 580
RP 572
RP 576

A

RP 580

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What covers Risk-Based Inspection - Base Resource Document?

RP 571
Publ 581
Publ 2201
RP 576

A

Publ 581

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What covers Procedures for Welding or Hot Tapping on Equipment in Service?

RP 571
Publ 581
Publ 2201
RP 576

A

Publ 2201

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

The _______________ is responsible to the Owner/user for activities involving design, analysis or evaluation of pressure vessels and pressure-relieving devices covered by this inspection code.

Engineer
The Inspector or Engineer
Corrosion Specialist
Owner

A

Engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

The _______________ shall maintain certification records of the examiners employed, including dates and results of personnel qualifications.

Engineer
The Inspector or Engineer
Corrosion Specialist
Owner

A

Examiner’s Employer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The Inspection Plan should be developed by

The Inspector
The Engineer
The Inspector or Engineer
The Inspector and Engineer

Engineer
The Inspector or Engineer
Corrosion Specialist
Owner

A

The Inspector or Engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Who shall be consulted when needed to clarify potential damage mechanisms and specific locations where they may occur?

Engineer
The Inspector or Engineer
Corrosion Specialist
Owner

A

Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

When RBI assessments are used to set vessel inspection intervals, the assessment shall be updated after _______________.

A

Each Vessel Inspection

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Who should the Inspector consult to determine when it is necessary to remove deposits or linings to perform adequate inspections.

Engineer
The Inspector or Engineer
Corrosion Specialist
Owner

A

Corrosion Specialist

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Temperature range Carbon and Low Alloy Steels are susceptible to CUI.

10 F and 350 F
0 F and 350 F
140 F and 350 F
140 F and 4000 F

A

10 F and 350 F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Temperature range Austenitic Stainless Steels are susceptible to CUI.

10 F and 350 F
0 F and 350 F
140 F and 350 F
140 F and 4000 F

A

140 F and 400 F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

With Austenitic Stainless Settls, CUI usually is in the form of _______________.

A

Stress Corrosion Cracking

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Type 300 series stainless steel should be conducted with potable water or steam condensate having a chloride concentration of _______________.

A

Less than 50 ppm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

At ambient temperatures, carbon, low-alloy and other ferritic steels may be susceptible to __________ failure.

Brittle
Crack
HICC
SCC

A

Brittle

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

To minimize the risk of brittle fracture during a pressure test, the metal temperature should be maintained at least __________ degrees F above the MDMT for vessels that are more than 2” thick.

10
20
30
40

A

30

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

Crack-like flaws and environmental cracking in welds shall be assessed by _______________.

Engineer
The Inspector or Engineer
Corrosion Specialist
Owner

A

Engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

Preferential weld corrosion shall be assessed by _______________.

Engineer
The Inspector or Engineer
Corrosion Specialist
Owner

24
Q

If re-pumping a flanged joint is contemplated, afftected fasteners should be __________ first.

Engineer
The Inspector or Engineer
Corrosion Specialist
Owner

25
Evaluate and accept NDE examination results (4.2.4) Engineer The Inspector Corrosion Specialist Owner
Inspector
26
Develop the Inspection Plan for Vessels & Relief Devices (5.1.1.1) Engineer The Inspector or Engineer The Inspector Owner
Inspector OR Engineer
27
Review the Inspection Plan for equipment operating at elevated temperature (5.1.1.1) Engineer The Inspector Corrosion Specialist Owner
Corrosion Specialist
28
Choose to conduct RBI assessments (5.2) Engineer The Inspector Corrosion Specialist Owner
Owner/User
29
Familiar with characteristics of potential damage mechanisms (5.4.2) Engineer The Inspector or Engineer The Inspector Owner
Inspector
30
Determine whether it’s necessary to remove deposits or lining (5.5.2.3) Engineer The Inspector or Corrosion Specialist The Inspector Owner
Inspector AND Corrosion Specialist
31
Perform On-Stream Inspection (5.5.3.1) Engineer The Inspector or Engineer Inspector OR Examiner The Inspector Owner
Inspector OR Examiner
32
Approve On-Stream Inspection work performed by Examiners (5.5.3.1) Engineer The Inspector or Engineer Inspector OR Examiner The Inspector Owner
Inspector
33
Perform External Inspection (5.5.4.1.1) Engineer Inspector OR Qualified Others The Inspector or Engineer Inspector OR Examiner The Inspector Owner
Inspector OR Qualified Others
34
Review corrosion data if short-term corrosion rate varies significantly (5.5.5.3) Engineer The Inspector and Corrosion Specialist The Inspector Owner
Inspector AND Corrosion Specialist
35
Assure those taking thickness measurements are trained and qualified (5.5.5.4) Engineer The Inspector or Corrosion Specialist The Inspector Owner
Owner/User
36
Determine locations of CMLs for vessels with localized corrosion (5.6.3.1) Engineer The Inspector Corrosion Specialist Owner
Corrosion Specialist
37
Involve if the # of CML’s will be signigicantly reduced or eliminated (5.6.3.2) Engineer The Inspector Corrosion Specialist Owner
Corrosion Specialist
38
Determine type of expected damage and select NDE method (5.7.1) Engineer The Inspector or Engineer Inspector and Examiner The Inspector Owner
Inspector AND Engineer or Corrosion Specialist
39
Perform UT flaw detection for finding linear flaws (5.7.1.2) Engineer The Inspector or Engineer Inspector OR Examiner The Inspector QUTE - API Certified UT Owner
QUTE - API Certified UT
40
Determines when a pressure test is needed after a repair - “believes” (5.8.1.1) Engineer The Inspector or Engineer Inspector OR Examiner The Inspector QUTE - API Certified UT Owner
Inspector
41
Approve substituting NDE for a pressure test (5.8.7.1) Engineer The Inspector or Engineer Inspector and Examiner The Inspector QUTE - API Certified UT Owner
Inspector AND Engineer
42
When verifying new materials, determine the sampling percentage (5.9.1) Engineer The Inspector or Engineer Inspector OR Owner/User The Inspector QUTE - API Certified UT Owner
Inspector OR Owner/User
43
Assess crack-like flaws attributed to environmental cracking (5.10.3) Engineer The Inspector or Engineer Engineer OR Corrosion Specialist The Inspector QUTE - API Certified UT Owner
Engineer OR Corrosion Specialist
44
Assess preferential corrosion in welds (5.10.3) Engineer The Inspector or Engineer Engineer OR Corrosion Specialist The Inspector QUTE - API Certified UT Owner
Inspector
45
Review and approve RBI assessments that extend intervals beyone 10 years (6.3.2) Engineer The Inspector and Engineer Engineer and Corrosion Specialist The Inspector QUTE - API Certified UT Owner
Inspector AND Engineer
46
Determine the External & Internal Inspection Interval (6.4.1 & 6.5.1.1) Engineer The Inspector and Engineer Engineer and Corrosion Specialist The Inspector QUTE - API Certified UT Owner
Inspector OR Engineer
47
Approve the use of On-Stream Inspection in lieu of Internal (6.5.2.1) Engineer The Inspector and Engineer Engineer and Corrosion Specialist The Inspector QUTE - API Certified UT Owner
Inspector
48
Determine the Relief Device interval (6.6.2.1) Engineer The Inspector or Engineer Engineer or Corrosion Specialist The Inspector QUTE - API Certified UT Owner
Inspector OR Engineer OR Qualified Others (PTV Tech)
49
Select which Corrosion Rate (short vs. long) reflects the current condition (8.1.1) Engineer The Inspector and Engineer Inspector and Corrosion Specialist The Inspector QUTE - API Certified UT Owner
Inspector AND Corrosion Specialist
50
Maintain Vessel and Relief Device records (8.1.1) Engineer The Inspector and Engineer Inspector and Corrosion Specialist The Inspector QUTE - API Certified UT Owner
Owner/User
51
Authorize all vessel repairs (8.1.1)
Inspector
52
Authorize all repairs to Div. 2 vessels 8.1.1) Engineer The Inspector and Engineer Inspector and Corrosion Specialist The Inspector QUTE - API Certified UT Owner
Inspector AND Engineer
53
Authorize all alterations (8.1.1) Engineer The Inspector and Engineer Inspector and Corrosion Specialist The Inspector QUTE - API Certified UT Owner
Inspecto AND Engineer
54
Repairs - Approve all methods of design, materials, WPSs, NDE & Testing (8.1.2.1) Engineer The Inspector and Engineer Inspector and Corrosion Specialist The Inspector QUTE - API Certified UT Owner
Inspector
55
Alterations - Approve all methods of design, materials, WPSs, NDE & Testing (8.1.2.1) Engineer The Inspector and Engineer Inspector and Corrosion Specialist The Inspector QUTE - API Certified UT Owner
Inspector AND Engineer