00 Preparation for Construction Flashcards
1
Q
The process of relocating the point of boundaries and property line of the site where the building is to be constructed.
A
Staking Out
2
Q
A plastic cord or galvanized wire where the reference of the building measurement is established.
A
String
3
Q
A weight attached to a string used for vertical line check.
A
Plumb Bomb
4
Q
Used to shape and support fresh concrete until cured and able to support itself.
A
Formwork.
5
Q
Temporary platform to support workers and materials on the face of a structure.
A
Scaffold
6
Q
Temporary Supports designed to carry forms for beams and slabs.
A
Shoring