Calculating a Yield Percent:
(EPQ / APQ) X 100 = yield%
Calculating Trim Loss Percent:
(Trim loss quantity ÷ APQ) (100) = Trimloss%
Calculating EP Quantities:
APQ * Yield % = EPQ
Calculating AP Quantities:
EPQ / Yield % = APQ
As-purchased cost (APC):
The cost paid to the supplier for a product.
As-purchased quantity (APQ):
The quantity (weight, volume, or count) of a product as it is received from the vendor.
Edible portion cost (EPC):
The cost per unit of the product remaining after processing and/or preparation. The EPC accounts not only for the cost of a fabricated product but also for the cost of any unusable trim.
Edible portion quantity (EPQ):
The quantity (weight, volume, or count) of a product that is ready to use after processing and/or preparation. The word edible in this term indicates that the product is ready for use in preparing a dish.
Yield percent of a product is affected by a number of different factors including:
Intended use of the product, The quality and condition of the product,The size of the product being prepared, The skill/attentiveness of the person preparing the product, The equipment used
Dimensional analysis method
converting between volume and weight. (such as cups to ounces)
1. If something converts 1.5 cups to 1 ounce, and you have 7 cups, divide by 1.5 to get amount of ounces, and then divide ounces by 16 to make sure that the answer is a fraction of ounces.