Who is responsible for ensuring the adequacy and accuracy of all tag-outs, including those proposed by the RA? They shall also verify that tags, which are no longer needed, are removed as soon as possible after the operation/work line item(s) have been cleared.
Ship’s Force
What documentation supersedes all planned or preventive maintenance systems or programs?
PMS
What is the purpose of the Current Ships Maintenance Project (CSMP)?
Provides shipboard maintenance managers with a consolidated listing of deferred maintenance to identify the material condition of the ship.
Whose responsibility is it to give a weekly status update on the Work Center’s 3-M self-assessment program, CSMP, and PMS accomplishments and Non-accomplishments to the Division Officer?
LCPO/LPO
Who is responsible for reviewing PMS assignments and performing quality maintenance IAW procedural documentation?
Maintenance Person
What must happen when periodic maintenance is not accomplished?
A “Rescheduled” or “Out of Periodicity” check note entry is annotated
What color of paper are classified MRCs printed on?
Pink
What provides a listing of the MIPs for systems and equipment assigned to each Work Center, and systems and equipment not requiring PMS or currently being evaluated for PMS?
List of Effective Pages
After reactivating equipment from IEM, documentation must be retained for a minimum of….
13 weeks
Which of the following is NOT a responsibility of the Executive Officer in regards to the 3-M program?
Conduct weekly maintenance on ship’s equipment
What is a 7 character alphanumeric code which is assigned to each MRC?
SYSCOM MRC Control Number
What is required when HAZMAT is transferred form the primary container to a secondary container?
A label has to be attached
One of the WCS responsibilities is to generate and electronically save a Maintenance Outlook report for PMS due within the next how many weeks for following each weekly close out?
26
Who is responsible for ensuring that personnel assigned to their respective areas understand and comply with the Tag-Out User’s Manual?
Department Head
Which of the following is NOT listed on the List of Effective Pages?
Situational Requirement Report
For metered events, how often must meters be updated in SKED?
Weekly or when required
What is the purpose of a Maintenance Requirement Card?
To provide detailed procedures for performing maintenance requirements
In the absence of the DIVO, the… shall complete weekly close out of maintenance in SKED 3.2.
LCPO
Who is responsible for reviewing, and initialing the line outs on the Work Center LOEPs, MIPs, and R-Check reports?
LCPO
Which of the following is a Calendar Periodicity Code?
Q
How many parts are there in the Tag-Out Log?
6
After how many days of creation must a work candidate be reviewed for accuracy and validity by the Department Head and in which block will this be annotated in OMMS?
90; Recommended Solution
As a qualified maintenance person, what do you do upon completion of preventive maintenance?
Sign the accountability log immediately upon completion of the maintenance action (PIN function for users with SKED 3.2)
What does the acronym NMR mean?
No Maintenance Required
What does JSN stand for?
Job Sequence Number