volume x hose lays Flashcards
while loading the 2 1/2 load, load in a cris cross fashion while placing a loop every ____ feet.
100
after the engineer stops at the hydrant and proceeds to fire with apparatus what is the next step?
dumps tank and charges line after it is in position
the engineer is responsible for making a sufficient pullback from the hose bed to reach the 3 1/2 “ intake, breaks the supply line and connects it to the 3 1/2 intake. true or false?
true
true or false- the engineer is required by volume 10 to dump the tank before establishing a water supply even flowing master streams.
true
while performing a forward lay 2 1/2” the engineer takes the proper engineers loop and coupling and connects it to the ________
discharge
the engineer is required to ___ the ____ before hooking up the supply line for the sting gun evolution.
Dump the tank
the _____ is responsible for assisting the captain connect both lines in an extended line
engineer
while performing a portable monitor the engineer is responsible to only flow water when?
when ordered
the stinger monitor was designed to operate in the deck pipe mode mounted _____ ____ _____, and also the _______ mode placed on the ground away from the apparatus.
on the truck
portable
prior to flowing water through the monitor always be sure the _____ _____ are fully engaged.
latch pins
when water pressure is applied to the unit the monitor will lift up slightly about _____ of an inch.
3/15
the monitor hand wheel drives a ______ gear which controls the stream elevation.
worm
a safety stop pin prevents the stream to be lowered past ______ degrees
25
it is recommended that the ff should be at least ____ to ___feet away to give directions where to point the master stream.
8 to 10
to minimize the possibility of the hose lines moving the monitor how many feet of hose shall be in a straight line behind the monitor
10 ft