Vestright week 2 Flashcards

1
Q

What is the feasibility study also known as

A

The due diligence period

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the sticks 6 steps of the development process

A

Feasibility study man juice application my news app submission approval process land use approval and subdivision Construction

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Land Developers have who under them?

A

Engineer, Geotechincal Engineer, Traffic Engineer, Environmental Scientist, Hazardous material inspector, Suveyor, The title company

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Civil Engineers duties

A

Prepares the initial subdivision layout in other words plotting the land

Understand and follow the code requirements

prepare a cost estimate

prepare all applications

attend all meetings stop

Advise the developer of decisions that have to be made

manic subcontractors

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Which player is the Hub of the project?

A

Engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What does a layout stand for

A

A rendering of how a piece of property could potentially be subdivided or laid out

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What does a Geotechincal Engineer do?

A

Investigating understand what is beneath the ground surface to determine if the subsurface is stable enough to build homes on

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What does a Traffic

Engineer do?

A

Studies what impacts a new subdivision will have on existing Street and Roads

determines how many new trips will be added by the new subdivision

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What does Environmental Scientist do

A

Determines how much ground will be lost or natural resource area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is a bugger known as

A

The space between the natural resource and the lot

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Lists of Property ownership info from Title company

A

Farms

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

The only way to get an accurate way to know if the property is going to possibly work for you is to do what

A

Pay for a feasibility study

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

When is the earnest money paid

A

after we have done the feasibility study

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What will Engineer do in stage one of Feas Study?

A
schedule the Wetland biologist
 determine actual buildable ground
 determine lot yield
 create layout
 fine-tune layout with developer
 prepare packet for pre-application conference
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What is a pre-application conference

A
Meeting with City County planner
City County engineer 
Sanitary sewer department
 Water Department
 Fire
 Etc
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

In this you will receive comments thoughts feedback on the developments purple proposed plan

Give developers a good sense of what does and doesn’t work in the proposed development plan

A

Pre Application Conference

17
Q

Stage 3 consist of what?

A

finalize the layout to another round of changes and tweaks

order a phase 1 Environmental study / soil containment testing

what are hazards materials inspection if there is an existing structure

18
Q

Stage 4 consist of what?

A

The construction cost estimate.

how much will it cost for the streets utility lines streetlights Landscaping excetera

19
Q

Once the feasibility study is done you will spend approximately how much?

A

$20K-$50K

20
Q

Feasibility studies take around how long to complete

A

90 days

21
Q

The act of a jurisdiction granting permission to a developer to move forward actually built the subdivision

A

Land Use Approval

22
Q

Land Use Application

A

A package of documents compiled by the developers engineer that will be submitted to the jurisdiction so the city or county request remove you in formal approval for the developers subdivisions proposal

23
Q

This means that they have all the proper information needed to be able to review it and possibly approve it but it does not mean it is approved

A

Deemed Complete

24
Q

Most jurisdictions by law have how many days from the time they deem the land-use application complete to review the application to decide if they’re going to approve it it’s approved the project

A

120 days

25
Q

Preliminary plat approval is also known as what

A

entitlements