USBR FIST 2-7 Flashcards

1
Q

One of the best sources of information in planning a major overhaul should be the?

A

Maintenance records for the unit or units involved

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

At least 6 months, but preferably a year before the planned overhaul a thorough inspection of the unit should be done to?

A

Determine the condition of the equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

A list of weights of all of the machines components should be made from the…

A

Drawing information

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

If the unit inspection indicated that substantial welding repair it required , a ____________ for the required repairs should be written and distributed to all personnel that will be involved in the welding.

A

Welding procedure

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

On units with replaceable seal rings, a ________ should be kept onsite

A

Spare set of rings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are your 4 pre shutdown readings?

A

Shaft runout readings
Bearing temperatures
Pressures
Permanent magnet generator voltage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are your 3 preteardown readings?

A

Guide bearing and seal ring clearances
Generator air gap
Shaft alignment readings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Why should most parts be matched marked?

A

To make sure they are installed in exactly the same position from which they were removed

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Why should the rigging to lift the thrust block include turnbuckles?

A

So that the block can be kept level to prevent binding when it is lifted off the shaft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Upon removal all guide and thrust bearings should be thoroughly inspected. Minor scratches and even some deep gouges can be repaired adequately by?

A

Carefully scraping the high spots from the Babbitt surface

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

In most cases the repair of cavitation damage can be accomplished much more effectively with the runner…

A

Removed from the turbine pit

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Where an overlay of a dissimilar metal material is being used, such as bronze or stainless steel over mild steel, enough material should be removed to allow for at least _____ weld passes to be made.

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

If the packing box is still structurally sound, the interior bore of the box can be built up with a properly applied ______ coating

A

Epoxy

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The bearing cooling coils should be thoroughly _________ and __________ tested.

A

Inspected, hydrostatically

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How do you find the units center?

A

The upper bridge and headcover should be installed after all the rotating parts have been removed. A single tight wire should be hung through the unit and reference measurements taken from the stator, the turbine bearing housing, the packing box bore and to trammel points in the draft tube

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The dowels have a very tight fit to prevent?

A

The components from shifting once the part is positioned

17
Q

When doweled components are moved during the alignment process following the overhaul what is necessary?

A

Redoweling

18
Q

A more accurate method of measuring the preload of a bolt is to measure the?

A

Amount the bolt stretches as the nut is tightened

19
Q

To make the bearing centers all concentric the shaft must be perfectly plumb. This can be accomplished by?

A

Installing the turbine bearing and shimming the shaft to center in the turbine bearing

20
Q

When taking readings with a feeler gauge it is essential that the segment be held…

A

Level and tight against the adjusting bolt

21
Q

What is squeeze

A

Squeeze is the amount the servomotors travel after the gates contact eachother

22
Q

There should be generous leakage upon initial startup after the installation of a new turbine shaft packing. The packing gland should be __________ evenly and in _______ steps until the leakage is reduced sufficiently.

A

Tightened, small

23
Q

A very thorough inspection of the generator housing and spiral case should be made to check for…

A

Any bolts, nuts, tools, etc.

24
Q

The upper guide bearing, the thrust bearing, and the PMG are usually insulated from the frame to prevent damage that could occur from…

A

Circulating currents passing through them. Insulation should be checked with a ohmmeter

25
Q

What are your operational readings?

A

Bearing heat run
Shaft runout readings
Load rejection tests