Unit 1b Flashcards
____ the focal point for aerial port mission execution.
Air Terminal Operations Center (ATOC)
The load planning process is performed ____ before aircraft departure; however, it must be completed no later than ____.
12 hours
6 hours
consists of traffic management and air transportation specialists. At most AMC bases with an Aerial Port Squadron, the traffic management process and procedures, to include in small air terminal operations, reside in the aerial port.
Cargo Operations Flight/TRC
Central point through which all information relating to airlift traffic flows and aerial port operations is received, processed, and dispatched to each functional area as well as the chain of command.
Air Terminal Operations Center
Plan, select, sequence, and monitor aircraft cargo/mail loads.
Load Planning
Control and prepare documentation for cargo and mail moving in the AMC airlift system on TWCF aircraft, and aircraft offering opportune airlift
Cargo Operations Flight
Ensures all manifested cargo and mail is loaded and offloaded as required.
Ramp Operations Flight
Provides complete range of services to accommodate arriving or departing passengers and baggage.
Passenger Operations Flight
Responsible for unit planning, resources, unit mobility, force protection, and administrative functions.
Readiness & Resources Flight
Final quality control for all transportation documentation; enables proper accounting for TWCF
Records, Reports & Analysis
Prepare, rig, and inspect Air Force supplies and equipment for AMC assigned air drop missions and unilateral air drop training.
Aerial Delivery Flight
Function as the operations officer’s representative and monitor/oversee aerial port operations after duty hours and anytime deemed necessary.
Duty Officer/Senior Controller