Training Bulletin 183-187 Flashcards
TB 187 Oasis Hydrant Assist Valve- The OHAV weighs ____ and hydrostatically tested to ___ psi and has a maximum flow of _____ gpm.
35 lbs
900 psi
2,000 gpm
At the tailboard, the member will remove the OHAV and hydrant sling from the tailboard of the engine and proceed away from the tailboard ___steps. The member will then wrap the hydrant with sufficient slack (___ft. past the hydrant) then verbalize for the engineer to “take off” to the fire.
7 steps
10 ft
The OHAV weighs 35 pounds and is constructed from?
Cast alluminum
Which is NOT an apparatus spotting option for the OHAV valve?
Onside rear
THE OHAV shall be inspected at all of the following except?
weekly
The OHAV shall be inspected
Daily
After use
prior to be placed into service
When inspecting the OHAV, one of the checks is to ensure that the hand crank is in what position?
Turned Counterclockswise