TPC 319 Flashcards

1
Q

Before new equipment arrives at the plant for installing it are made by the

A

Plant engineer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When pouring a concrete footing, you should hold the steel rods in position with

A

tie wires

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The best materials for filing around a foundation are gravel and

A

ground concrete slabs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

The type of bolt to anchor the equipment is usually specified by the

A

equipment manufacturer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How long must new concrete sit before you can install equipment on it?

A

28 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Retainers on the sides of horizontally reciprocating equipment keep it from

A

walking

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

To isolate anchor bolts when mounting equipment on pads, surround the bolts with

A

neoprene tubing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What type of wrench should you use for tightening anchor bolts

A

Torque

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

To drill anchor bolt holes larger than 1 1/2 in., you should use a

A

core bit with a diamond or carbon tip

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

You should not use a concrete mix to grout anchor bolts, because the concrete

A

shrinks when it sets

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

If new equipment is damaged in shipment you should report it to the

A

carrier

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What must you do first before disconnecting the electrical wiring to existing equipment?

A

Shut off the power

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the least number of rollers you should use under a load on a skid

A

Three

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

When moving equipment with a crowbar, what should you use between the bar and the floor?

A

A wood block

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

If you have no clearance to remove a sling after setting the equipment down, you should lower the equipment onto

A

wedges

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

To keep your body heat from affecting a master precision level, you should handle it by its

A

non heat conductive top plate

17
Q

To support a level on an inverted V shaped way, use a precision

A

V block

18
Q

To support a level across machine tool ways in different planes, you should use precision ground parallels or

A

gauge blocks

19
Q

The common dial indicator is usually used with a ___ base.

A

Magnetic

20
Q

When an alignment screw is finally set you can prevent further movement by

A

applying a sealing compound

21
Q

The external air lines on equipment usually terminate just beyond a filter or a

A

regulator

22
Q

If the fluid in a system is thick you can control it with a ___ check valve

A

ball

23
Q

You can keep the fluid pressure in a line near a preset level with a ___ valve

A

regulating

24
Q

A copy of the manufacturers test data is often attached to the ___ of new equipment.

A

manual

25
Q

High temperatures during equipment start up is usually caused by

A

poor lubrication