Topic 4.2.2 Flashcards

1
Q

Why are micropiles used

A

To provide structural support
To underpin foundations
To transfer loads
To enhance mass stability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How small are micropiles

A

Less than or equal to 300mm in diameter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Capabilities of PIT

A

Defects can be discovered at an early stage
Testing can be carried out on any accessible pile
The method is quick and economical
Large number of piles can be tested in a single day

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Limitations of PIT

A

Test does not give any information about bearing capacity under load
Minor deficiencies may not be discovered
Presence of debris at pile toe cannot be detected
Gradual changes in cross section may not be detected

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Cycles of static load test

A

1st cycle - 1.5x Design Load
2nd cycle - 2.0x Design Load
3rd cycle - Ultimate load / 2.5-3.0x Design Load

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Compression test for pile

A

Kentledge system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Tension and compression test for pile

A

Reaction frame system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

How can reactions be applied for reaction frame test

A

Tensile piles
Ground anchors

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What should pile layout plan show

A

Types of pile and specifications of material
Allowable total and differential foundation settlement
Location of piles and site investigation boreholes
Allowable variation limit during installation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What does QP have to ensure during pre-construction

A

Builder submits a vibration monitoring plan showing locations of vibration monitoring devices with stipulated vibration limit stated

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

What does QP have to submit to BCA for record

A

Vibration monitoring plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly