Top 100 Flashcards
All fire alarm systems (new and existing) require __________.
Documentation
What 4 things need to be delivered on completion?
Owner’s Manual
Record Drawing
Record of Completion
Site Software
A __________ is required at the control unit. All system records are stored there.
Document Cabinet
Equipment powered by _____ or _____ shall be listed with the control unit.
IDC
SLC
What 3 things does a circuit breaker require?
Lock
Cabinet lock or locked room door
Marked “FIRE ALARM” in red
All fire alarm systems and supervising stations require _____ hours standby power.
24
Commercial fire alarm (premises, remote, central, proprietary, auxiliary) require _____ minutes alarm power.
5
Voice evacuation and in-building MNS require _____ minutes alarm power.
15
Household fire alarm requires ___ minutes alarm power.
4
Battery calculations require an additional _____ safety margin.
20%
Secondary power shall switch within _____ seconds.
10
Alarm notification, emergency functions, and annunciation shall occur within _____ seconds of activation.
10
Supervisory signals shall indicate within _____ seconds.
90
Trouble signals shall indicate within _____ seconds.
200
Equipment shall operate at __________ % voltage, __________ degrees Fahrenheit, and _____ % humidity.
85-110
32-120
85
__________ shall be provided at the control unit, NAC extenders, and transmitting equipment.
Smokes
Each __________ shall be a separate zone.
Floor
If the systems serves multiple buildings, ___________ shall be zoned separately.
Each building
Class: Redundant (return path), operates with single ground of open.
Class A
Class: Single path, operates up to single open, EOLR on IDC and NAC.
Class B
Class: Multiple paths, no supervision of paths, operation verified by receipt of signal.
Class C
Class: Fail-safe operation
Class D
Class: No supervision
Class E
Class: Class A SLC with operates with short, fault isolator per device.
Class X
Class: Network (Ethernet), dual cable/fiber to each Ethernet device or segment.
Class N
Records of tests and operations shall be kept until the next test and __________.
One year thereafter
The __________ is responsible for IT&M and may delegate responsibility in writing.
Owner
100% Acceptance testing shall be done on all _________ systems.
New
Smoke detectors require __________ testing (annual) and __________ testing.
Smoke entry
Sensitivity
Smoke detector sensitivity shall be tested within _____ year(s), and then _____ year(s).
1
Every other
If smoke detector sensitivity remains in range, sensitivity testing may be extended to _____ years.
5
Smoke alarms in dwellings shall be tested __________ by occupant and replaced every _____ years.
Monthly
10
__________ devices shall be protected from damage, guard shall be listed with device used with.
Initiating
Detectors in concealed locations more than _____ feet AFF require remote indicator (except addressable).
10
Partitions extending within _____% of ceiling height shall be considered separate rooms.
15
All points along the ceiling shall have a detector within _____ of listed spacing.
0.7
What 3 things can affect detector location and spacing?
Joist
Beam
Slope
Heat detectors shall not be located within _____ inches of sidewall, or between _____ inches from ceiling if wall mount.
4
4-12
Heat detectors shall be at least _____ degrees Fahrenheit above maximum expected ceiling temperature.
20
True or false - Heat detectors have a listed spacing that varies?
True