What are the 4 reasons to improve communication?
Reduce failures, innovations and better solutions, influence quality, better decision making.
What is the definition of Construction Communication?
To convey and instruction to influence the actions or behaviors of others.
What are the 3 steps that you need to commit to help make a customer a Raving Fan?
Decide what you want, Discover what the customer wants, Deliver plus one.
What are the two behaviors that will help deliver customer service?
Flexibility and Consistency.
What hinders communication within the construction field?
Lack of respect and Trust.
What is the meaning of camaraderie?
A spirit of familiarity and trust between friends, a spirit of friendly good fellowship.
What are 2 ways to build a Fan in the crew?
Provide training, team or crew events.
Why would you ignore a customer’s wants?
A customer’s wants would not meet what you can provide.
Why would you want your crew to have camaraderie?
The people can be trusted to complete tasks, work safely, and have pride in their work.
Communications with a customer and crew members will achieve what kind of change?
Improve the industry in motivation and processes.
True/false
Fall Arrest means you cannot fall over the edge.
False.
True/false
Fall restraint means you can possibly fall over the edge.
False, you cannot fall over the edge.
Simon Roofing standard distance for setting up perimeter lines away from the edge of the roof is?
10 ft.
What is the minimum distance the PR 600 Pivot arm needs to be from the edge of the roof?
15 ft.
A carabineer is important to connect what parts of your Fall Protection kit?
Lanyard and Beam wrap.
A hard hat is required to be worn at what time according to Simon Roofing standards?
25 ft. from ladder, overhead work or low objects. Up and down the ladder.
A ladder setup requires a 4 to 1 ratio which will allow how many points of contact while ascending?
3 points.
Where on the roof does a fire extinguisher belong?
Maximum 50 feet from work and same level.
All electric tools must be plugged into a GFCI. What does GFCI mean?
Ground Fault Circuit Interrupter
Propane tanks must be secured and set away from the kettle how far?
25 feet
Propane bulk tanks must be set how far away from the building and placed in what direction to the building?
10 feet, parallel
How many fire extinguishers are required by the kettle and what types are they?
3, CO2 and ABC
In the Safety Data Sheets of material, what section is most important in case of an injury?
Health
What are you not permitted to operate in a company truck while you are driving?
MP3, computers, tablets, or any electronic device
What does excessive speed in a company truck mean?
Excess of posted signs or speeds in excess of 75 mph
What types of posters are required to be visible on the job site?
OSHA Job Safety and Health
What is OSHA’s definition of a Hole?
Any opening 2” or more in its least dimension
A cover over a hole must support how much weight?
Twice as much as the heaviest person, material or machine that might step or set over the cover
A cover over a hole must be marked with what words?
Hole, Cover, Danger, Roof opening
What does a skylight need on a roof that will meet OSHA standards?
Guard rail system or a cover
A roof hatch requires what 2 options to comply with OSHA standards?
Guard rail system or the lid of the hatch be closed
Which core value address leadership and continuous education?
6
Which core value is the foundation on which we build trust?
2
Which core value exceeds expectations by creating raving fans?
4
Which 2 core values promote competitiveness and strive to be frugal
7 and 8
The setup area on the Pre-Construction form has a list of concerns. What are they?
Underground pipes, septic and sprinkler systems, Air intakes, windows, siding, grass, landscaping, low-lying and soft or wet areas
What are areas of concern that are on the Pre-Construction form?
Bad deck, conduits, wires, alarm systems, piping attached to underside of deck
What anticipated disruptions should the owner be told may happen before the project begins?
Noise, smells or odors
The JSA helps to identify what in Safety?
Hazards
What equipment should be loaded, at the shop on a truck or trailer, last?
Safety
Name 3 existing conditions to the outside of a building that needs to be documented.
Tar drips, missing or broken lights or cameras, Dented or damaged siding, gutters or down spout
Staging material on the roof requires you to know where what strong structure is to place the material on
Column
Tarps must cover material adequately and what else do you have to do with tarps?
Weigh and tie with banding or rope
How much does a 4x8 bundle of ½ “fiber board insulation weigh?
2000#
How much does a 4x4 bundle of 2” polyisocyanurate insulation weigh?
150#
What does a pallet of Ultra weigh?
1800#
What does a roll of SR Superiorply SAM II weigh?
85#
How many square feet does a bundle of ½”x 4’x8’ wood fiber board cover?
3072 sq. ft.
How much weight can be staged of a Structural column?
4000#
What is the procedure when power lines are a safety concern?
Shut off, insulate
What type of squeegee is used to apply SuperiorFlex Seal Max?
¼” serrated
How much time is needed to mix SuperiorFlex Seal Plus?
3 minutes
What is the time line for the curing process of the SuperioFlex Seal Max?
8 hours at 70 degrees and 50% humidity
What is the elongation of Wite Brite Elastomeric Coating?
1002.98%
- What are the 3 hindrances for applying Wite Brite Elastomeric Coating?
Rain within 24 hours, temperatures fall below 50 within 24 hours, exposer to freezing temps
What is the mixing time for the SuperioFlex Seal Max?
4 minutes
What are the dimensions of the Starters for a 3 ply Ultra system?
12”, 24” 36”
What 2 issues causes mole runs in an Ultra system?
Foot traffic, not relaxing the roll
What is the elongation percentage of the SuperiorFlex Seal Plus?
2073%
How many linear feet of 5 course (12”/18”poly) will a 3.5 gallon pail of Hi Bild cover?
35 lf
What is the ratio mix of Part A to Part B for the SR Insulation Adhesive?
1 to 1
SR 452e system requires what SR Products to complete the system?
SAM II, SuperiorFlex Seal Max, SuperiorFlex Gold MB, Hi Bild, Wite Brite Elastomeric, Poly, Poly Plus 40
What product(s) is used to seal the end laps of an SR 452e system?
SuperiorFlex Gold MB
How close should a bead of SuperiorFlex Seal Max be placed from the edge of the bottom ply?
2 inches
How far apart should the Seal Max beads be applied under the SAM II?
18 inches
How many gallons of SuperiorFlex Seal Plus are required for a flood coat over an existing gravel roof to embed aggregate?
10 to 12 gallons
Why do we install one layer of felt or resin paper over a metal deck before we install an SR 447 system?
SuperioFlex Seal Plus bleeding through the joints of the insulation on to the metal deck
What systems is used to restore a metal roof?
SR 513a & SR 513d
How many coats of Wite Brite Elastomeric coating is applied over the SR Poly Plus 40 II on a SR 452e system?
2 coats
What is the minimum amount of aggregate that is specified for an SR 434 system?
400 lbs.