Test_Questions Flashcards

0
Q

What are the 4 reasons to improve communication?

A

Reduce failures, innovations and better solutions, influence quality, better decision making.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

What is the definition of Construction Communication?

A

To convey and instruction to influence the actions or behaviors of others.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the 3 steps that you need to commit to help make a customer a Raving Fan?

A

Decide what you want, Discover what the customer wants, Deliver plus one.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the two behaviors that will help deliver customer service?

A

Flexibility and Consistency.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What hinders communication within the construction field?

A

Lack of respect and Trust.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the meaning of camaraderie?

A

A spirit of familiarity and trust between friends, a spirit of friendly good fellowship.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are 2 ways to build a Fan in the crew?

A

Provide training, team or crew events.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Why would you ignore a customer’s wants?

A

A customer’s wants would not meet what you can provide.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Why would you want your crew to have camaraderie?

A

The people can be trusted to complete tasks, work safely, and have pride in their work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Communications with a customer and crew members will achieve what kind of change?

A

Improve the industry in motivation and processes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

True/false

Fall Arrest means you cannot fall over the edge.

A

False.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

True/false

Fall restraint means you can possibly fall over the edge.

A

False, you cannot fall over the edge.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Simon Roofing standard distance for setting up perimeter lines away from the edge of the roof is?

A

10 ft.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is the minimum distance the PR 600 Pivot arm needs to be from the edge of the roof?

A

15 ft.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

A carabineer is important to connect what parts of your Fall Protection kit?

A

Lanyard and Beam wrap.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

A hard hat is required to be worn at what time according to Simon Roofing standards?

A

25 ft. from ladder, overhead work or low objects. Up and down the ladder.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

A ladder setup requires a 4 to 1 ratio which will allow how many points of contact while ascending?

A

3 points.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Where on the roof does a fire extinguisher belong?

A

Maximum 50 feet from work and same level.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

All electric tools must be plugged into a GFCI. What does GFCI mean?

A

Ground Fault Circuit Interrupter

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

Propane tanks must be secured and set away from the kettle how far?

A

25 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

Propane bulk tanks must be set how far away from the building and placed in what direction to the building?

A

10 feet, parallel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

How many fire extinguishers are required by the kettle and what types are they?

A

3, CO2 and ABC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

In the Safety Data Sheets of material, what section is most important in case of an injury?

A

Health

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What are you not permitted to operate in a company truck while you are driving?

A

MP3, computers, tablets, or any electronic device

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

What does excessive speed in a company truck mean?

A

Excess of posted signs or speeds in excess of 75 mph

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

What types of posters are required to be visible on the job site?

A

OSHA Job Safety and Health

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

What is OSHA’s definition of a Hole?

A

Any opening 2” or more in its least dimension

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

A cover over a hole must support how much weight?

A

Twice as much as the heaviest person, material or machine that might step or set over the cover

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

A cover over a hole must be marked with what words?

A

Hole, Cover, Danger, Roof opening

29
Q

What does a skylight need on a roof that will meet OSHA standards?

A

Guard rail system or a cover

30
Q

A roof hatch requires what 2 options to comply with OSHA standards?

A

Guard rail system or the lid of the hatch be closed

31
Q

Which core value address leadership and continuous education?

A

6

32
Q

Which core value is the foundation on which we build trust?

A

2

33
Q

Which core value exceeds expectations by creating raving fans?

A

4

34
Q

Which 2 core values promote competitiveness and strive to be frugal

A

7 and 8

35
Q

The setup area on the Pre-Construction form has a list of concerns. What are they?

A

Underground pipes, septic and sprinkler systems, Air intakes, windows, siding, grass, landscaping, low-lying and soft or wet areas

36
Q

What are areas of concern that are on the Pre-Construction form?

A

Bad deck, conduits, wires, alarm systems, piping attached to underside of deck

37
Q

What anticipated disruptions should the owner be told may happen before the project begins?

A

Noise, smells or odors

38
Q

The JSA helps to identify what in Safety?

A

Hazards

39
Q

What equipment should be loaded, at the shop on a truck or trailer, last?

A

Safety

40
Q

Name 3 existing conditions to the outside of a building that needs to be documented.

A

Tar drips, missing or broken lights or cameras, Dented or damaged siding, gutters or down spout

41
Q

Staging material on the roof requires you to know where what strong structure is to place the material on

A

Column

42
Q

Tarps must cover material adequately and what else do you have to do with tarps?

A

Weigh and tie with banding or rope

43
Q

How much does a 4x8 bundle of ½ “fiber board insulation weigh?

A

2000#

44
Q

How much does a 4x4 bundle of 2” polyisocyanurate insulation weigh?

A

150#

45
Q

What does a pallet of Ultra weigh?

A

1800#

46
Q

What does a roll of SR Superiorply SAM II weigh?

A

85#

47
Q

How many square feet does a bundle of ½”x 4’x8’ wood fiber board cover?

A

3072 sq. ft.

48
Q

How much weight can be staged of a Structural column?

A

4000#

49
Q

What is the procedure when power lines are a safety concern?

A

Shut off, insulate

50
Q

What type of squeegee is used to apply SuperiorFlex Seal Max?

A

¼” serrated

51
Q

How much time is needed to mix SuperiorFlex Seal Plus?

A

3 minutes

52
Q

What is the time line for the curing process of the SuperioFlex Seal Max?

A

8 hours at 70 degrees and 50% humidity

53
Q

What is the elongation of Wite Brite Elastomeric Coating?

A

1002.98%

54
Q
  1. What are the 3 hindrances for applying Wite Brite Elastomeric Coating?
A

Rain within 24 hours, temperatures fall below 50 within 24 hours, exposer to freezing temps

55
Q

What is the mixing time for the SuperioFlex Seal Max?

A

4 minutes

56
Q

What are the dimensions of the Starters for a 3 ply Ultra system?

A

12”, 24” 36”

57
Q

What 2 issues causes mole runs in an Ultra system?

A

Foot traffic, not relaxing the roll

58
Q

What is the elongation percentage of the SuperiorFlex Seal Plus?

A

2073%

59
Q

How many linear feet of 5 course (12”/18”poly) will a 3.5 gallon pail of Hi Bild cover?

A

35 lf

60
Q

What is the ratio mix of Part A to Part B for the SR Insulation Adhesive?

A

1 to 1

61
Q

SR 452e system requires what SR Products to complete the system?

A

SAM II, SuperiorFlex Seal Max, SuperiorFlex Gold MB, Hi Bild, Wite Brite Elastomeric, Poly, Poly Plus 40

62
Q

What product(s) is used to seal the end laps of an SR 452e system?

A

SuperiorFlex Gold MB

63
Q

How close should a bead of SuperiorFlex Seal Max be placed from the edge of the bottom ply?

A

2 inches

64
Q

How far apart should the Seal Max beads be applied under the SAM II?

A

18 inches

65
Q

How many gallons of SuperiorFlex Seal Plus are required for a flood coat over an existing gravel roof to embed aggregate?

A

10 to 12 gallons

66
Q

Why do we install one layer of felt or resin paper over a metal deck before we install an SR 447 system?

A

SuperioFlex Seal Plus bleeding through the joints of the insulation on to the metal deck

67
Q

What systems is used to restore a metal roof?

A

SR 513a & SR 513d

68
Q

How many coats of Wite Brite Elastomeric coating is applied over the SR Poly Plus 40 II on a SR 452e system?

A

2 coats

69
Q

What is the minimum amount of aggregate that is specified for an SR 434 system?

A

400 lbs.