test revision Flashcards
Labour constant rate
Labour rate x labour constant rate
profile factor
corrugated iron
weatherboards
10 common trades
Plumbing & gasfitting Roofing Carpentry Joinery Metalwork Demolition Glazing Drainage Tiling Blockwork Brickwork Precast concrete Concrete works
how many decimal places
2dp = $35.00
SOQ
schedule of quantities
kiwisaver rate
2%
tool allowance
50 cents per hour
productive hours
Working hours 47.50 hours
- wet time
- lost time
- lunch breaks
- tea breaks
insurances say
3%
holiday pay
16%
ACC Levies
3.5%
Clothing Allowance
50 cents per hour
Labour rate
weekly pay + all extras
Built up rate
labour rate build up/ productive hours
Two types of SOQ
elemental
Trade
CCWFEL
C= material cost C= cartage allowance W= wastage F= fixings E= minor equipment L= labour constant
cartage
+- 2.5%
SOQ are used for?
tendering purposes
- producing final accounts
- valuing progress payments
- relieves tenderer of the onus and cost of making their own measure and schedule.
what standard
ANZSMM 2018
Provisional sums
allowance usually estimated by the qs and included in the tender documents/SOQ.
Prime Cost Sums
monies allowed for u chosen items. adjusted one items are selected.
examples of pc sums
- tap fittings
- tiles
contingency
monies set aside for unforeseen works. only be spent under authorisation of client/architect/QS. sometimes inserted into SOQ.
Trade summary
Typically at the front of SOQ and is a summary of all trades price. Exclusive of GST.
tTypes of Contracts
RMBA contract
- NZ:3910:2013 standard form of - contract
- NZIA forms of contract