__________ define standard activities that are performed by the Incident Commander to achieve the tactical objectives.
Functions of command
The __________ level directs activities toward specific objectives.
tactical
When sectorizing buildings with odd geographic positioning, the front of the building always becomes “sector A”. Other alphabetical designations are provided in a (an) __________ flow around the building.
clockwise
_______ is defined as a timely and efficient means of air replacement and re-hydration of companies while maintaining their sector assignments.
Recycling
The Fire Department’s involvement and needs at the incident scene can be divided into four sections. They are logistics, planning, operations and __________.
administrative
Of the following examples, the one that does not require personnel accountability report (PAR) to be initiated;
at the 20-minute elapsed time notification
When operating at a high-rise building, lobby sector will utilize passports to track all crews and crewmembers in the building. Crews will leave their passports with fire personnel ___________ if Lobby Sector has not been established.
in the fire control room
__________ is a conscious process involving the very rapid but deliberate considerations of the critical factors and the development of a strategy and rational plan of attack based on those conditions.
Size-up
Command must consider all __________ sides of the fire. Failure to do so frequently results in fire extension.
7
The announcement of a change to a defensive strategy will be made as __________ and all personnel will withdraw from the structure and maintain a safe distance from the building.
“emergency traffic”
The Second priority in defensive operations is __________.
exposure protection
The most urgent reason for calling additional alarms is for the purpose of covering __________
life safety
Contributing factors to early structural collapse include parapet walls, large open areas, large signs or marquees and __________.
cantilevered canopies
Upon receipt of the emergency traffic evacuation order, company officers shall assemble their crews and promptly exit to a safe location, where the company officer will report __________.
a par for all crew members
The initial roof sector officer must report to command all of the following conditions except:
distance to the most severe exposure
Throughout each of the three tactical priorities, the safety and survival of firefighters, __________ and loss control functions are continuously addressed.
customer service
The main objective of overhaul operations is to seek out and extinguish all remaining fire and control loss, stabilize the incident scene by providing for firefighter safety and to secure the structure. Additional objectives should include __________.
preserve evidence and secure the fire scene
A reasonable guideline for extrication sector is an initial commitment of one company per __________ victims for extending initial and immediate care when numerous patients are involved in a major incident.
5
Of all the sectors, the treatment sector typically requires the heaviest commitment of personnel. During major incidents, one company per __________ patients should be the initial objective.
4
When dealing with a hazardous materials incident the primary objective is to __________ before formulating a plan of action.
identify the type of material involved
When spotting the apparatus at a trench cave in, the first company should spot the apparatus at least ___ feet away from the location of the trench failure
50
Preventing excessive apparatus congestion at the scene and allowing time for Command to evaluate conditions prior to assigning companies are objectives of __________.
staging
Effective use of ______ procedures will prevent excessive apparatus congestion at the scene and allow time for Command to evaluate conditions prior to assigning companies.
staging
Level I staging is in effect for all incidents with ___ or more companies responding.
3