Q

Balancing Authority A is currently reading a system frequency of 60.06Hz. Its Net Actual Interchange is +100MW and its Net Scheduled Interchange is +160MW. If Balancing Authority ‘s frequency bias setting is -100MW/0.1Hz, Balancing Authority A’s AGC should be pulsing its generators to ______.

A

Remain at current MW output level

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

The initial response to a frequency deviation is due to which of the following?

  1. Load/frequency response
  2. AGC
  3. Governor action
  4. Interchange schedules
A

1&3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Interconnection frequency is 59.80Hz. Your ACE is a large negative value and your AGC is pulsing your units down. What should you do?

A

Suspend AGC and investigate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

To conform to the CPS requirements, a Balancing Authority must have a _____.

A

CPS greater than or equal to 100%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Balancing Authority A is currently reading a system frequency of 59.98Hz. Its Net Actual Interchange is +100MW and its Net Scheduled Interchange is +100MW. If Balancing Authority A’s frequency bias setting is 100MW/0.1Hz, what is ACE?

A

-20

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

A Balancing Authority is performing Overlap Regulation Service for another Balancing Authority. What will apply?

A

The Balancing Authority’s Frequency Bias Setting shall be modified to reflect the combined Frequency Bias Setting of both Balancing Areas.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

A CPS1 violation is an indication that:

A

A BA’s ACE is hindering frequency

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

You are ready to restore power to a generator facility. Which of the following Transmission lines would be the best choice best choice to energize the facility?

  1. 25 mile, overhead transmission line
  2. 10 mile, overhead transmission line
  3. 25 mile, underground transmission cable
  4. 10 mile, underground transmission cable
A

10 mile, overhead transmission line

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Who must have plans for operator controlled manual load shedding to respond to real-time emergencies?

A

Transmission Operators and Balancing Authorities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

During a system emergency, the System Operator can direct other Transmission Operators and Balancing Authorities to violate which limit?

A

None. Equipment parameters should be maintained within their established limits

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

A severe lightning storm has hit your transmission system. Two 345kV lines have been damaged and unable to be re-energized. Two large generators of 500MW and 700MW have tripped offline. No additional generators are available to bring online. The parallel 230kV and 138kV lines are loaded at their emergency limits. What should a system operator do?

A

Shed load

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Once a Balancing Authority inform the Reliability Coordinator of future or current Capacity and Energy Emergencies, it is the responsibility of the ____ to mitigate the emergency condition.

A

Reliability Coordinator and Balancing Authority

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

If a Balancing Authority is unable to purchase capacity or energy to meet its demand and reserve requirements on a day-ahead basis, which entity or entities, is it expected to notify?

A

Its Reliability Coordinator and Balancing Authorities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

If a transmission Operator or Balancing Authority is unable to restore Real and/or Reactive Power Balance, they must request emergency assistance from the Reliability Coordinator. If Operating Reserves are not available, corrective action need to include:

A

implement manual load shedding

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

If a Balancing Authority or Reserve Sharing Group is experiencing conditions where all available resources are committed to meet firm load, firm transactions, and reserve commitments, what does the deficient entity need to request their Reliability Coordinator to issue?

A

Energy Emergency Alert Level 1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Each transmission operator is required to have a system restoration plan. What is the first thing a Transmission Operator must do when energizing a blacked out area?

A

Isolate the load

17
Q

Which of the following is considered a reliability event?

  1. low voltage
  2. loss of a small generator
  3. SOL or IROL violations
  4. Loss of Energy Management System
A

1&3

18
Q

A Balancing Authority has a Net Interchange Schedule of -250MW’s from 1200 to 1600 on a summer day. The Net Interchange actual for those same hours respectively were -230MW, -275MW, -250MW, and -270MW. What was the balancing authority’s inadvertent interchange for the 4-hour period?

A

Net for the period=25MW’s in

19
Q

A radial transmission line is overloaded. Which action must a Transmission Operator do to unload the line?

A

Shed load at the end of the radial line

20
Q

Your system is on the verge of a voltage collapse and all reactive resources are at a maximum output. You have determined that shedding firm load will alleviate the problem. Before shedding load, with whom must you confirm the action?

A

No one.

*you are the TOP in this scenario

21
Q

When a system is on the verge of a voltage collapse and nothing else can be done to alleviate the problem, operating personnel should consider _____.

A

reducing load in the area with the low voltage