Test Flashcards
What is the Type Commander of USS GEORGE WASHINGTON CVN-73?
COMNAVAIRFOR
What is utilized to install PMS packages to reflect changes in system/ equipment configuration and to provide PMS documentation?
Force Revision
What is utilized to record unaccomplished maintenance?
Flip page
When an MRC is lined out on a MIP what must be included to the left of the line out IAW current instructions?
Scheduling aid
What is the minimum amount of time equipment must be IEM once placed in a lay-up status?
30 days
When the work center supervisor signs the change page it indicates what?
All MIPs have been reviewed, validated, and signed by the WCS
What program is vital to ensure continued supervisory involvement in the quality assurance of maintenance actions?
Spot check program
The purpose of the _____ is to provide shipboard maintenance managers with a consolidated listing of deferred maintenance to identify the material condition of the ship.
CSMP
Who is the Type Commander for CVN-73?
COMNAVAIRFOR
What document must be initialed and signed by the WCS and DIVO on a weekly basis?
13 week accountability
How often must the work center supervisor perform a back up of their work center in SKED?
Once a week
When a PMS check is staisfied by a higher level what must be annotated on the flip page?
Who performed the maintenance and the date accomplished
What tool in SKED assists the WCS in scheduling R-checks?
Trigger local events
A _____ feedback report is used to meet PMS needs which do not change the scope of the maintenance.
Category A (non-technical)
A ____ feedback report is used in changing the scope of the maintenance or discrepancies that inhibit PMS performance
Category B (technical)
What reference is the Ship’s Maintenance and Material Management Manual?
NAVSEAINST 4790.8 (series)
Which reference is the TYCOM Maintenance and Material Management Manual?
COMNAVAIRFORINST 4790.1 (series)
What shipboard instruction governs the disposal of HAZMAT?
GWINST 4110.1B
Who is responsible for verifying procedural steps listed on new/changed MRCs against installed equipment?
Work center supervisor
Who is responsible in supervising the maintenance personnel in performing maintenance requirements?
Work center supervisor, Lpo, and Chief
An R-check is a ______
Situation requirement
What is required for a quarterly close out?
RAR sheet, quarter schedule and flip page
Any periodicity, annual and above, can be rescheduled no more than?
One quarter after the scheduled quarter
If a WCS or a higher position is turned over, all _______ within the work center manual for that position will be _____ as soon as possible or no later than the implementation of the next Force Revision
Line outs, re-initialed
If multiple maintenance persons are assigned to a single maintenance action, who will sign the 13 week file for completion of the maintenance?
The petty officer in charge or most senior person assigned