Test 3-3 Flashcards
When lifting a transmission line timber with a helicopter, the spreader bar should be made of
Epoxy
The voltage rating of rubber protective equipment is based on the thickness of the material. Plastic protective devices are thinner and provide protection because of ____
an air space between the conductive object and the cover
When performing live-line hot sticks work on transmission lines the clear hot stick distance is ____
equal to the minimum approach distance found in table R-6
The climbing ladders used on aesthetic tower____
have step bolt on alternate side of center rail
A wire tong and lever lift have been attached to support the weight of a conductor of a 138 kv line.
The tension will be held by a ____ rigged near the pole top
strain link stick and rope blocks
A 1-1/4 inch A.B. Chance strain link stick is designed for a maximum tensile working load of 3,500 pounds. A similar stick with a 1-1/2 inch diameter has a (n) _____ pound tensile strength working load
6,500
Of the two practical hot stick methods used to replace a pin insulator on a single-phase line, the ____ method requires only one wire tong.
lift
For replacing a damaged pole, the ____ method is preferred by many electric workers,since fewer tools are required, and time can be saved
leaning pole
When replacing insulators on a vertical 138kv angle structure from the pole, the 1-1/4 inch strain links sticks have a rating of 3,500 pounds each. If 1-1/2 inch strain links are used, the tension rating is increased ___ each
to 6,500
The job is the replacement the crossarm on a 230 kv H structure fitted with x braces.To provide the proper clearance for hoisting the timbers, the center phase is lowered. The X braces_____
must be completely removed
Regarding the use of a rural strain carrier, which one of the following statements is true.
This wooden device although made obsolete by modern equipment, is still suitable for live line work if properly maintained
When performing rubber glove work from a rated bucket truck_____
a worker is never totally dependent on rubber gloves ; a second line of defense is essential
When conditions permit, the first step in a single-phase hot sick pin insulator replacement job is to ____
disengage the neutral
To replace insulator on an outside conductor of a 500 kv line, contact of the bull rope with the conductor must be avoided. The disconnected insulator string is moved to the tower body and then lowered. The _____ method uses a rubber wheel and a suspension insulator tool
Trolley pole
A current transformer sends reduced current to a transformer-rated meter that is typically designed to operate at a maximum of ____
5