Test Flashcards
What is defined as any piece of equipment, sub-equipment, system, or subsystem requiring maintenance?
Maintenance item
What is the ships 3m manual?
NAVSEAINST 4790.8C
WCS shall use what view in sled to manage the work center?
Work center
Who can authorize the splitting of a MIP if an MRC requires another work center to completely preform the MRC?
XO
Work center or equipment changes will be reported in OMMS system using what?
OPNAV 4790/CK
What is the 4-character number assigned by the work center to a maintenance action or assigned by the outside activity performing the work
JSN
In sked what organizes maintenance items under like categories
Maintenance groups
What are two types of technical feedback reports
Routine and urgent
Inactive equipment maintenance that falls under status 1 is defined as?
Equipment that will remain on board, is not scheduled for corrective maintenance or overhaul and will be inactive for seven days or longer
Sked uses what display for supervisors to forecast man-hours, tools, parts, and test equipment
Forecast display
In sked, when supervisors add or reschedule PMS, future occurrences of the check will adjust accordingly to maintain proper periodicity?
True
In sked what display provides PMS history for all maintenance items in a work center and provides the next schedule date in which maintenance should be preformed again?
Review display
Who is the functional manager of the 3M system?
3MC
Who is the 3MC responsible to?
XO
Who is accountable to the division officer for the proper operation of the 3M system within their division
LCPO/LPO
What form is used to provide amplifying information related to a maintenance action
OPNAV 4790/2L
Written permission from _________ or higher authority, is required to place any system or individual piece of equipment into IEM?
Dept. head
All line-outs and additions to the LEOP, MIPS, MRC and situational reference sheets must have appropriate justification. What is appropriate justification?
Scheduling aids, fully approved FBR, alternate work center
What is required for work centers to line-out all MRCs on a MIP, except for the U, SU, LU, PM, or OT checks
Approved FBR
What are the three types of spot checks?
Historical, maintenance validation, and monitored maintenance
How often will the 3MC ensure that a self-assessment is completed?
Quarterly
What symbol following periodicity code indicates a safety of ship item?
*
What symbol following the periodicity code indicates that this procedure is intended to be scheduled and preformed by off- ship maintenance personnel?
+
21.
C