Test 1 Flashcards
The loaded radius as shown on the capacity chart is the distance from the center of rotation to the centerline of the vertical hoist line with_____
The rated load suspended
If the jib angle to the ground is changed from 50° to 40° how would this affect the capacity of the crane
Capacity will decrease
Who is required to approve crane set up prior to its use
Crane operator
The operator should exercise extreme caution when lifting loads from the water mainly because
The load on the crane will increase as an object leaves the water
The surface giving the best possible reading when leveling a crane would be located
On the superstructure
When working on soft soil with poor bearing support:
Use matting to distribute the cranes wait over a large area
The best way to determine the weight of a load to be lifted is to:
Have a certified load weight and add in the weight of all rigging
When a situation arises that will not permit out Riggers to be set at positions that correspond to the locations established by the manufactures load rating charts, the crane manufacturer shall be consulted to determine if any capacity reductions, special operations procedures, or limitations are required. If the required information is not available from the manufacturer who shall be consulted?
Qualified person
When performing a Pickin carry operation using a mobile crane, the load Shall be position:
Over the front
A thick dark in line running across the load chart means that the load ratings:
Above the lines are limited by structural factors
Dynamic motion such as swinging with a load can cause what change in the crane operation?
Increased load radius
Before making a near capacity left with the crane the operator must:
Test the hoist breaks by lifting the load a few inches and holding it
A work area chart is used to:
Identify capacity changes due to operational quadrants
Which of the following three sling hitches are listed in order from the strongest to the weakest?
Basket, vertical, choker
If your crane needs to be re-spooled due to a slack rope condition what should be done?
Remove slack before starting the lift
The minimum distance for safety between the swing radius of the counterweight and any obstacle is:
2 feet
What is the best source of information for determining boom tip height
Working range diagram
Attachments or extra counter way it’s not approved by the manufacture should not be attached to the rear of the crane because of?
They may cause a backwards stability problem
If lifting a load with two cranes of different rate of capacities the crane with the larger really capacity should:
Be hooked at a distance closer to the loads center of gravity
The only time the out rigor beams should be less than fully extended is when:
The load chart indicates that it is allowed
The boom angle indicator shows boom angle in reference to the capacity chart:
Is used along with the boom length to determine radius
On a telescopic crane when is the boom a deduction
Never a deduction
The drum flange shall extend a minimum of _____over the top layer of the rope at all times
Half inch
In running ropes other than rotation resistant rope what is the number of Randomly distributed broken wires in LA of rope that would require it to be replaced
Six broken wires
When an extension jib is erected on the boom tip when does it become a deduction?
When not in use
The backwards to ability of the crane is tested with the basic boom at?
Maximum angle with no load
When rotation of the load may be hazardous the operator should:
Verify that a tagline is used
Which of the following could be most dangerous when working a crane near a newly constructed building?
Non-compacted soil covering underground utilities
And auxiliary boom head or rooster Sheave is intended to be used with:
A whip line
If the cranes power fails during operation the operator should:
Set all brakes and locking devices
Wire rope lubricant should not:
Hinder a visual inspection
What is one of the most common effects of boom sideloading
Structural failure
As per ANSI B30.5, How many full wraps of rope are required on the hoist rum when the hook is an extreme low position
Two full wraps
Construction site hazards and restrictions such as electric power and piping are located and identified by?
Preoperational work site inspection
If a machine is not level and then swings a load from the high side to the low side the load radius will:
Increase
Which of the following will not cause a two block in condition on hoist lines
Raising the boom
And example of duty cycle crane operations would be:
High-volume concrete placement
When load radius is between radii values the operator must use the
Longer radius
What determines the suitability of the supporting surface to handle all expected loads during Cran operation
Voids, tanks, loose Fill, depressions