Test 1 Flashcards

1
Q

Bottom supported can work in shallow water up to 33` - not used currently

A

Inland Barge

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Bottom supported. Most versatile bottom supported rig. Can work over a multi-well platform if rig is “cantilever” type which most are. Water Depth = 15’ - 550’ depending on make and model. Requires good weather to move, but insensitive to weather when jacked up.

A

Jack up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Bottom supported. Can handle very high deck and derrick loads. Limited in water depth (15’ – 85’).

A

Submersible

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Floating. Less weather sensitive than a drill ship. Limited deck load capacity.Water depth range is 200’ – 12,000’.

A

Semi- submersible

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Floating and most mobile of all offshore rigs. Highest deckload capacity of floating rigs, but also most weather sensitive and has highest fuel consumption. Water depth = 200’ – 12,000’.

A

Drill Ship

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Requires a pre-installed platform. Bottom supported, or buoyant (TLP or Spar), least weather sensitive of all offshore rigs, except when rigging up or rigging down which is quite an endeavor. High rig up costs, but good for multi-well developments because they typically cost less than Jack-ups

A

Playform

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

There are three fundamental functions that must be performed during drilling. List these below.

A

a) Break the rock
b) Remove the broken rock (cuttings) to clean the hole.
c) Maintain the wellbore stable (keep the hole open, prevent kicks or loss of return)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

6 major rig systems

A

a) Power
b) Hoisting
c) Circulating
d) Rotary
e) Well control
f) Well monitoring

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

to conduct the drilling fluid from the ocean floor to the drilling vessel

A

marine riser or drilling riser

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

both have the same function; allows lateral movement of the vessel.

A

ball joint / flex joint

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

to keep the drilling riser under constant tension with the vertical
movement of the vessel (heave)

A

pneumatic tensioning device

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

allows the vertical movement of the vessel

A

slip joint

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

connected to the surface casing it allows hanging of all remaining casings in the well and has a connector profile for the connection of the BOP .

A

high pressure housing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

allows the deviation of fluid flow from the riser to overboard or to the mud gas separator.

A

diverter system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Describe the function of a Pipe Ram valve in the BOP system?

A

Function: Close the annular space between against the drillpipe.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Name the two general types (classes) of rig power systems

A

a) The diesel-electric type

b) The direct drive type

17
Q

Write a simple, but complete sentence explaining why calculating the displacement of drillpipe based only on the O.D. and I.D. underestimates the actual pipe displacement.

A

Because calculation based on OD and ID only neglects the tool joint dimensions and any existing internal or external upset of the connections.

18
Q

Name three components of the rotating system.

A

a) Kelly
b) Rotary table
c) Drill pipe and drill collars

19
Q

Name three components of the well monitoring system.

A

a) Weight indicator
b) Driller`s panel
c) Pit level indicator

20
Q

Name three components of the circulating system.

A

a) Mud pumps
b) Mud pits
c) Solids control equipment

21
Q

Name three components of the hoisting system.

A

a) Derrick
b) Block and tackle
c) Drawworks

22
Q

Write a simple, but complete sentence describing the function or purpose of having blind rams (not blind- shear) in a BOP stack.

A

Close the well when there is no string in the well

23
Q

Write a simple, but complete sentence describing the function or purpose of having variable bore pipe rams in a BOP stack.

A

To close the well, when more than one size of drillpipe is in the hole.

24
Q

What is the name of, which also describes, the procedure used on a rig to minimize the risk of a drilling line failure due to wear or fatigue?

A

Slip and cut operation