Tech Specs Flashcards
1
Q
8.1.1 Boration Sys Operating (Shutdown)
A
M 1-3. Two paths. One Boric acid tank, pump, and charging pump. The other a CCP via RWST to RCS. Can’t be same path.
M4. Need 1 OR Other. Stop Core Alts if NOT met. Enter 8.0.3
M 5-6. Need 1 OR other flow path. IF NEITHER, IMMED suspend core alts and pos reactivity additions.
2
Q
Basis for Liquid and Gas Storage TRM
A
Limit exposure due to liquid tank failure to less than 10CFR20 limits.
Gas Tank Based on failure which limits exposure to less than .5 REM at site boundary.
3
Q
TRM Refueling Requirements
A
Direct Comms Between CR and Refueling at ALL Times. RNO Immed Suspend core alts.
Shall be Sub Crit for at least 120 hours. (M3)