Tech - Electrical Flashcards
Q1. There are four sources of AC power: GEN1, GEN2, APU GEN, & EXT PWR.
What is the normal priority of supply for AC BUS1?
A1. The normal priority of supply for AC BUS 1 is :-
(i) GEN 1
(ii) EXT PWR
(iii) APU GEN
(iv) GEN 2
Q2. After no 2 engine start, which generator is powering AC BUS 1?
{Consider APU GEN on- line.}
A2. APU GEN
Q3. In flight, GEN 1 has failed and there is no APU. Which generator is powering AC Bus 1?
A3. GEN 2is powering AC BUS 1. There is automatic shedding of part of the galley load.
Q4. Name the different AC bus bars?
A4. The different AC BUS BARS are :-
(a) AC BUS 1
(b) AC BUS 2
(c) AC ESS BUS
(d) AC ESS SHED
(e) AC STAT INV
(f) AC GND/FLT
(g) AC SVCE BUS
Q5. Name the different DC Bus bars?
A5. The different DC BUS BARS are :-
(a) DC BUS 1
(b) DC BUS 2
(c) DC ESS BUS
(d) DC ESS SHED
(e) HOT BUS 1
(f) HOT BUS 2
(g) DC BAT BUS
(h) DC GND/FLT
(i) DC SVCE BUS
Q6. What is TR?
A6. TR is short for Transformer Rectifier. A TR unit is used to convert AC into relatively smooth DC. Independently :-
(a) Transformer : A Transformer changes the AC voltage source, be it from a generator or power line, to a different voltage for any number of applications.
(b) Rectifier : A Rectifier changes AC electricity, which travels in two directions, to DC using components called diodes, which only pass the electricity in one direction.
Q7. Normally, how the TRs supply the electrical network?
A7. In normal configuration :
(a) TR 1 normally supplies DC BUS 1, DC BAT BUS and DC ESS BUS.
(b) TR 2 normally supplies DC BUS 2.
Q8. If in a flight, both TR1 & TR2 are lost, which buses are lost?
A8. If TR 1 and TR 2 are lost; DC BUS 1, DC BUS 2 and DC BAT BUS are lost. The DC ESS BUS is supplied by the ESS TR.
Q9. Normally, ESS TR does not supply a/c electrical network. True or False?
A9. TRUE
Q10. Name any three abnormal / emergency conditions in which ESS TR is supplying DC ESS Bus?
A10. In the following conditions, the ESS TR is supplying the DC ESS BUS :-
(a) AC BUS 1 failure.
(b) Single TR failure.
(c) Double TR failure.
Q11. What is the function of static inverter? And to which BUS will it supply?
A11. A Static Inverter transforms DC Power from Battery 1 in to One KVA of single phase 115 Volt 400 Hertz AC power, which is then supplied to part of the AC ESS BUS. When the aircraft speed is above 50 knots, the inverter is automatically activated, if nothing but the batteries are supplying electrical power to the aircraft, regardless of the BAT 1 and BAT 2 P/b positions.
When the aircraft speed is below 50 knots, the inverter is activated, if nothing but the batteries are supplying electrical power to the aircraft, and the BAT 1 and BAT 2 P/b’s are both on at AUTO.
The STAT INV supplies partly to the AC ESS BUS.
Q12. What does the amber FAULT light in BAT P/B indicate?
A12. The FAULT Lt. comes on AMBER in the BAT P/b, accompanied by an ECAM caution, when the charging current for the corresponding battery is outside limits. In this case, the battery contactor opens.
Q13. If the BAT pushbuttons are in AUTO position overnight without any other power, will the batteries discharge completely?
A13. No, the batteries will not discharge completely. A Battery Automatic cut-off logic prevents the batteries from discharging completely when the aircraft is on the groung (Parking).
Automatic battery contactors open when :-
–The a/c is on the gorund.
–The BAT P/b s/w’s are at AUTO
–The main power supply (EXT PWR+GEN) is cut off
–Battery Voltage is low.
Q14. If automatic cutoff has occurred, how can the crew re-establish battery power?
A14. The flight crew can reset the contactors by switching the BAT P/b switch to OFF and then to AUTO.
Q15. If the battery switches are at AUTO, when will batteries be connected to the DC BAT BUS?
A15. The batteries are connected to the DC BAT BUS in the following cases :-
(a) APU starting (MASTER SW at ON & N< 95%).
Note : The conn. is limited to 3 mins when the emergency generator is running.
(b) Battery voltage below 26.5 V (Battery Charge). The charging cycle ends when battery charge current goes below 4 Amps.
–On ground, immediately
–In flight, after a time delay of 30 minutes.
(c) Loss of AC BUS 1 and 2 when below 100 knots (EMERG. GEN not supplying).