Switchboards Flashcards
Switchboard Groups
SG - Generator
SA - Stbd side
SB - Port Side
SP - Shore Power
10 Total Switchboards
APD
SWBD Automatic Paralleling Device
Utilized for the main bus breakers to parallel two generators
Positions of the APD
OFF, PERMISSIVE, RUN and TEST
PERMISSIVE (PERM): Phase (+/- 15 electrical degrees), freq. (+/- 0.2 Hz), Voltage (+/- 5%); breakers will be allowed to close by operator
RUN: Adjusts oncoming generator voltage and frequency to match bus conditions, and close designated breaker automatically
Load Shed
Feature in the Distribution System to prevent overload
- Can be initiated by the Commercial Off The Shelf Multifunction Monitor (COTS MFM) or by watchstanders at the UCCs or SWBDs
Load Shed
2 Stages of Load Shed
- LS1 - 100% of rated load for 100ms
- LS2 - 100% of rated load for additional 5 seconds, after LS1
Switchboards
Switchboards associated with #1 GTG
1SG, 1SA, 1SB (Aux 1)
Switchboards
Switchboards associated with #2 GTG
2SG, 2SA, 2SB (Main 2)
2SP (Shore Power)
Switchboards
Switchboards associated with #3 GTG
3SG, 3SA, 3SB (3 Gen)