SUP Flashcards
External Survey
Checking for damage ,running gear, sonar, exterior hull
Internal survey :
Checking for damage flooding, holes, cracks
All Navy salvage ships have a maximum bow lift of
150 Tons
Line handlers should stand__ off of a line while working it.
90 degrees
At what temperature is a dry suit or hot water suit recommended ?
Below 40 degrees
What are Cofferdams?
temporary watertight extensions of the hull to the surface.
What are the 3 types of cofferdams
- Complete
- Partial
- Small
A complete cofferdam is used when?
Vsl is sunk in sheltered waters
Temp repairs/sealing deck impractical. Main deck has many openings. Make decision to use only after detailed survey by salvage eng and salv officer
What are the UWSH manuals that deal with running gear?
Chapter 3,
Chapter 12
Chapter 13
Chapter 18
What NSTM deals with inspecting a CPP?
NSTM 245
After divers have surfaced and confirmed no obstruction then the dry dock will ___ to land the unit.
Be drained enough
A minimum of __ will be maintained between the floating dry dock and harbor bottom at all times
12”
What is the minimum length of the electrode before changing?
3”
Safety switches (when open) pose no electrical threat to the diver.
True
Both double pole and single pole are switches are authorized?
True
A double pole switch is most often used because because?
Both the working and the ground lead are opened or closed simultaneously
What are the 3 general types of work documents?
- Maintenance Procedures
- Formal Work Packages
- Controlled work packages
Maintenance Procedure MP
Task of maintenance performed.
Self explained
Formal Work Package FWP
Coordinates in a single document materials required, initial conditions, MP, Test and Inspections and system restoration for the selected maintenance task.
Controlled Work Package CWP
Required when higher authority requires a record (OQE) of repairs/maintenance for fabrication, repair, installation, inspection, and testing process for specific systems.