Study Guide Flashcards
How many hours ahead of time you need to notify agency that you will be performing a monitoring certification?
48 Hours
Technician performing a monitoring certification requires all the following except:
a. Tank Testers Certification
b. UST Equipment Installation Certification
c. Manufacturer’s Certification
d. CA UST Service Technician Certification
a. Tank Testers Certification
All of the following are approved secondary containment material except:
a. Isolated Steel
b. Stainless Steel
c. Cathodically Protected Steel
d. Fiberglass
b. Stainless Steel
A combustible detector measures the ________ of the area.
a. Flash Point
b. Specific Gravity
c. Oxygen Concentration
d. Ignition Point
a. Flash Point
Personal Protection Equipment does all except:
a. Provide eye protection
b. Provide protection against skin absorption
c. Provides protection against heat exhaustion
d. Provides hearing protection
c. Provides protection against heat exhaustion
All secondary containment must be tested at the time of installation and then ________.
6 months after installation, then every 3 years
Which of the following does NOT require Line Leak Detection?
a. Sloped Piping
b. Suction Piping
c. Pressurized Piping
d. Double-Walled Piping
b. Suction Piping
Shear valves are located ________.
Just under the dispenser
Suction piping valve is located ________.
Under the functioning pump
The word hazardous means any substance that can cause ________.
Harm
All of the following is true about hazardous waste storage except:
a. It requires are tight seal
b. It needs Hazardous Waste labeled on it
c. It needs a data accumulation started
d. It can be kept on site for 18 months
d. It can be kept on site for 18 months
Secondary containment testing results needs to be sent to the agency by the site owner/operator every ________.
3 years
The ________ performing the work is the one that fills out the monitoring certification form.
service technician
Dispenser investigation includes all of the following except:
a. Valves
b. Piping
c. Fittings
d. Meter Creep
d. Meter Creep
Secondary containment inspection should include all of the following except:
a. Cleaning debris from the area
b. Checking the position of the sensor
c. Removing liquid from the area
d. Making sure the boot on the pipe prevents fuel from dripping into the area
d. Making sure the boot on the pipe prevents fuel from dripping into the area
A site has Double-Wall tanks and Single Wall Lines, its overfill protection is the flapper valve. Which of the devices below does not need to be tested?
a. Line Leak Detector
b. ATG
c. Sump Sensors
d. Dispenser Sensors
b. ATG
__________ is the gas used for vapor systems.
Gaseous Nitrogen
Use ______ and pick up material and treat as hazardous waste to clean up a small spill.
absorbent
If cleaning water and fuel mixture out of an area you must treat is as ________.
hazardous waste
Definition of a tight tank is that it is capable of passing a _______ test.
0.1 GPH
Distance to the nearest hospital is NOT part of a ____________ plan.
confined space entry
ALL tanks and dispensers need to be listed on the _____ plan.
monitoring
For a tank being temporarily closed, structural ______ testing is NOT required.
integrity
All of the following can result in a fine except:
a. Falsification of information on monitoring cert
b. Tampering with a leak detection device
c. Disabling a leak detection device
d. Not replacing a faulty device immediately
d. Not replacing a faulty device immediately
_____ shut-off overfill devices are engaged at 95%.
Automatic
A service tech for monitoring needs to be re-certified every:
a. Year
b. 24 months
c. As often as manufacturer requires or 36 months, whichever comes first
c. As often as manufacturer requires or 36 months, whichever comes first
Interstitial space monitoring of a tank is required to be monitored
a. Daily
b. Monthly
c. Annually
d. Continuous
d. Continuous
For UST Systems, what are the restrictions by a Red Flag in place:
a. Prohibits dispensing of products
b. Prohibits depositing of product into UST
c. It means UST has temporary closure
b. Prohibits depositing of product into UST
The following are areas where a tech will be fined or penalized except:
a. Falsifying records
b. Not immediately replacing defective equipment
c. Tampering with the equipment
d. Disabling leak detection systems
b. Not immediately replacing defective equipment
All materials below are acceptable for piping except:
a. Catholically-protected copper
b. Catholically-protected steel
c. Fiberglass-Plastic
d. PVC
a. Catholically-protected copper
_____ means the volume of space above the product.
Ullage
Vapors are 3 to 4 times _____ than air.
a. Lighter
b. Heavier
c. More Stable
d. More Buoyant
b. Heavier
What is the first symptom of hazardous exposure?
a. Increased heart rate
b. Dizziness
a. Increased heart rate
What is the minimum capacity of a spill bucket that is required?
5 Gallons
Monitor certification requires testing of the following except:
Fire extinguishers
Secondary Containment system testing is required:
a. 6 months after install and every year thereafter
b. 6 months after install and every 3 years thereafter
c. Every year and every 3 years thereafter
b. 6 months after install and every 3 years thereafter
A steel tank requires protection for the following:
a. Corrosion
b. Cave-ins
c. Erosion
a. Corrosion
Fire components are all except:
a. Fuel
b. Oxygen
c. Ignition Point
d. Carbon Dioxide
d. Carbon Dioxide
All except the following are Stage I except:
a. Coaxial Drop Tube
b. Coaxial Breakaway Valve
b. Coaxial Breakaway Valve
Following are part of the overfill protection systems except:
a. Spill Buckets
b. Audible/Visual Alarm
c. Ball Float Valve
a. Spill Buckets
Secondary containment testing results must be submitted to local agency within ____ days.
30
Results of enhanced leak detection testing must be submitted to the local agency AND the state water resource control board within ____ days.
60
The minimum monetary punishment for any person who falsifies monitoring record is ______.
$5,000.00
Annual Monitor Certification must be made in a _______.
“Monitor System Certification” form
A tag sticker must be affixed to all components certified during annual Monitor Certification and shall have the date and _____ for all components certified.
Contractors license number
Effective July 1, 2005, service technicians shall posses or work under the direct supervision of an individual at the work site who possesses a current ICC certification indicating that he or she has passed the ___________.
California UST Service Technician Exam
All manufacturers’ certification must be renewed at the time interval recommended by the manufacturer, or ______ months, whichever is shorter.
36
By definition, an underground storage tank includes _______.
a. Only the tank
b. The tank and all connected piping
c. The tank, all connected piping and dispensers
d. Only tanks totally beneath the surface of the ground
b. The tank and all connected piping
Automatic line leak detectors, installed on underground piping with secondary containment, shall be capable of detecting a leak rate of ______ at 10 psi.
3 GPH
If equipped with an automatic tank gauge (ATG), it shall be programmed to test tank ________.
a. Daily
b. Weekly
c. Monthly
d. Yearly
c. Monthly
_______ is responsible for notifying the local agency prior to conducting secondary testing.
a. The testing company
b. The owner/operator
c. The service technician
d. The on-site manager
b. The owner/operator
______ is responsible for submitting the Monitor Certification to the local agency.
a. The testing company
b. The owner/operator
c. The service technician
d. The on-site manager
b. The owner/operator
Annual Monitor Certification records must be maintained on-site for a period of _____.
a. 2 Years
b. 3 Years
c. 5 Years
d. 10 Years
b. 3 Years
Tanks without secondary containment located within a specified distance of a public drinking water well require enhanced leak detection testing ______.
a. Every 2 years
b. Every 3 years
c. Annually
d. Every 5 years
b. Every 3 years
_____ is the electrical connection between two or more conductive objects such that they are at the same electrical potential.
a. Bond
b. Ground
c. Manifold
d. Transistor
a. Bond
The quickest route for exposure to toxic substances is _____.
a. Skin Absorption
b. Inhalation
c. Skin to skin transfer
d. Ingestion
b. Inhalation
The following product piping requires cathodic protection.
a. Single-Walled Steel
b. Single-Walled Fiberglass
c. Flexible Plastic
d. Double-Walled Fiberglass
a. Single-Walled Steel
If equipped with an overfill alarm, the alarm must be triggered to alert the delivery operator when ______.
a. The tank is filled
b. The delivery truck is 95% empty
c. The tank is no more than 95% full
d. The tank is 90%
d. The tank is 90%
_____ is the system for exchanging gasoline vapors between a vehicle fuel and a fuel storage tank during the vehicle fueling process.
a. Cathodic Protection
b. Stage I Vapor Recovery
c. Type A Vapor Recovery
d. Stage II Vapor Recovery
d. Stage II Vapor Recovery
What type of gas is used or vapor recovery testing?
a. Oxygen
b. Nitrogen
c. Methane
d. Benzene
b. Nitrogen
ICC certification must be renewed every _____ months.
a. 36 months
b. 24 months
c. 12 months
d. 18 months
b. 24 months
Any person who intentionally disables or tampers with an automatic leak detection system may be imprisoned for a term not to exceed _______.
a. 24 months
b. 12 months
c. 6 months
d. 5 months
b. 12 months
The technician should notify the owner/operator of a leak so they can report it within:
a. 36 Hours
b. 48 Hours
c. 24 Hours
d. 12 Hours
c. 24 Hours
Secondary containment installed after January 2001 should be testing upon installation and _________.
a. 6 months after and every 36 months thereafter
b. Yearly
c. Every five years
d. Monthly
a. 6 months after and every 36 months thereafter
The person installing Monitoring Equipment must possess any one of the following except:
a. C34 Pipeline Contractors License
b. C36 Plumbing Contractors License
c. Class A General Contractors License
d. A UST Monitoring Equipment Contractors License
d. A UST Monitoring Equipment Contractors License
The following is true of spill buckets EXCEPT:
a. Must provide drainage for spilled product into secondary containment sump
b. Must be tested annually
c. Designed to catch product spilled during disconnection of a delivery hose
d. For temporary storage
a. Must provide drainage for spilled product into secondary containment sump
What is the purpose of the spill bucket?
Catch any fuel spilled during fuel delivery or overfill
If installed after July 1, 1987, ______ must have secondary containment.
a. Vent or tank riser piping
b. Vapor recovery piping not designed for liquid product
c. Suction piping
d. Pressurized product piping
d. Pressurized product piping
According to the Health and Safety Code: the following component(s) are considered “pipe” on tanks installed after July 1, 2003:
a. Pressurized product piping
b. Below ground vapor recovery lines
c. Above ground vapor recovery lines
d. Both a and b
d. Both a and b
Under-dispenser containment was required for all UST systems by:
a. July 1, 1987
b. January 1, 1984
c. January 1, 2000
d. December 31, 2003
d. December 31, 2003
A vacuum-assist nozzle is a component of a(n):
a. Stage II Vapor Recovery System
b. Vapor Removal
c. Stage I Vapor Recovery System
d. Type A Vapor Recovery
a. Stage II Vapor Recovery System
The following components of UST systems with secondary containment require continuous monitoring EXCEPT:
a. Spill Bucket
b. Under Dispenser Containment
c. Interstitial Space of Double-Walled Tanks
d. Underground Piping
a. Spill Bucket
When statistical inventory reconciliation is utilized as a means of non-visual monitoring, tank integrity testing must be calculated every ______.
a. Year
b. 5 Years
c. 2 Years
d. 3 Years
c. 2 Years
By December 22, 1998, all automatic line leak detectors installed on single-walled pressurized piping must be capable of ______.
a. Triggering an audible and visual alarm
b. Shutting down the pumping system on any alarm
c. Shutting off flow at the dispenser
d. Restricting product flow
b. Shutting down the pumping system on any alarm
An automatic tank gauge is capable of _______.
a. Measuring diesel product temperature
b. Activating low level alarms for premium grade gasoline
c. Measuring product level of diesel product
d. All of the above
d. All of the above
When an automatic tank gauge is utilized for single-walled tank leak detection, it shall test the tank at least monthly after product delivery or when the tank is filled within ____ percent of the high operating level during the previous month.
a. 5
b. 10
c. 15
d. 20
b. 10
Single-walled suction piping shall be tested at least every ____ years at a pressure designated by the test equipment manufacturer.
a. 3
b. 2
c. 5
d. 10
a. 3
Pressurized product piping with secondary containment that is subject to an annunal pressure test must be tested with a method capable of detecting a ____ GPH release.
a. .005
b. .1
c. .01
d. .05
b. .1
Spill containment devices must be tested no less than ____ to demonstrate that it is capable of containing the hazardous substance until it is detected and cleaned up.
a. Every 6 months
b. Annually
c. Every 36 months
d. Every 3 months
b. Annually
If statistical inventory reconciliation is utilized as a means of release detection for a single-walled tank, _____ must be accomplished every 2 years.
a. Tank integrity testing
b. Secondary containment testing
c. A thorough walk around inspection
d. Interstitial monitoring
a. Tank integrity testing
Poppet valves are vapor recovery component installed _____.
a. In a nozzle assembly
b. On a vent riser
c. On a vapor-recovery riser
d. On a fill riser
c. On a vapor-recovery riser
A ______ is installed on the vent riser to prevent vapors from escaping or entering the system unless a pressure or vacuum condition exists that exceeds the design opening pressure or vacuum limit of the cap.
a. Poppet Valve
b. P/V Cap
c. Regulator
d. Vapor Governor
b. P/V Cap
A _____ Stage II Vapor Recovery System requires a vapor-tight seal between the nozzle spout and the vehicle fill pipe.
a. Vehicle fill pipe
b. Balance
c. Coaxial
d. Manifolded
b. Balance
All of the following devices are compatible with Coaxial Stage I Vapor Recovery system EXCEPT ______.
a. Automatic shutoff device
b. Overfill alarm
c. Ball-float valve
d. All of the above
c. Ball-float valve
A combustible gas indicator is used to measure the _____ of an area.
a. Flash Point
b. Ignition Point
c. Specific Gravity
d. Oxygen Concentration
a. Flash Point
A combustible gas indicator is used to measure what levels?
Lower Explosive Limits (LEL). Combustible has an indicator that is used to determine the concentration of flammable gases.
How long to notify agency prior to testing?
48 Hours
When is liquid collecting installed?
When there is not enough difference in elevation between the dispensers and the tank field to provide uniform slope of the vapor piping
Who imposes UST regulations?
Counties, Cities and/or Local Agency
How often should spill buckets be tested?
Annually
What is true about ATG systems
Capable of alarming operator of low product levels
What is affixed to the tag for certification date?
Contractor’s License Number
According to PEI-900, the purpose of Stage I is to:
A system of piping and hoses designed to transfer gasoline vapors from a UST to a delivery truck as product is transferred from the truck to the tank
Impressed Current System Cathodic Protection (CP)
The CP rectifier must always be on and operating to protect from corrosion
The following are all names for emergency shutoff valves except:
Check Valve
Liquid collecting is installed when?
When there is not enough difference in elevation between the dispensers and the tank field to provide uniform slope of the vapor piping
In an open piping system with the test boot still on, what must be done?
a. Cap and seal Schrader Valve
b. Remove Schrader valve and point boot horizontally
c. Remove poppet from Schrader valve and point boot downward
c. Remove poppet from Schrader valve and point boot downward
Tag/Sticker is to be placed on all devices except on the following:
Device out of service or removed
According to 6.7 Underground Storage of Hazardous Substances, what must be done when two store fluids in the same tank that when they come in contact may deteriorate the tank, leak or cause an explosion?
Separate them completely via primary and secondary containment
When manufacturing training is no longer available, who must approve before re-certification takes place?
Local Agency
This is the method to reduce the potential for electrostatic charge generating and sparking by using a connecting of 2 objects, reducing the likelihood of sparks jumping from metal to metal
Bonding
When an alarm occurs, what must be the response?
Immediately check piping & equipment for leaks
The following must be done after a dispenser fuel incident but prior to re-activating unit to normal operation except:
Re-certify and calibrate meter
When a service technician is out of confined space notices situation in which another tech needs assistance who is inside confined space, all of the following would be considered a correct response except:
Request for site personnel to go into confined space and assist
The following may be used as an approved method of leak detection for tanks except:
Back-pressure test
An approved method of leak detection for ATG must be tested every
30 days
What must be checked on a submersible pump that has no containment sump?
Cracks or damage on pump housing
A monitoring system is determined to be “fail-safe” when _______.
System shuts down when monitoring system loses power
What must be included with the monitor certification form?
A complete drawing of all equipment and site layout
Who is responsible for printing out a monthly sensor status report?
a. Owner
b. Manager
c. UST System Operator
a. Owner
Effective Jul1, 2005 service technicians shall possess or work under the direct supervision of an individual at the work site who possesses a current ICC certificate indicating that he/she has passed the:
a. CA UST Service Operator Exam
b. CA UST Service Technician Exam
c. UST Installer/Retrofitter Exam
d. All of the above
b. CA UST Service Technician Exam
How often should the ICC certification be renewed?
a. 24 months
b. 36 months
c. 12 months
d. 48 months
a. 24 months
Service technicians must possess or be employed by a person who possesses the appropriate Contractor License. This requirement however, is waived if the individual possesses a ______.
a. Tank Testing License
b. ICC Service Technician Certification
c. Cathodic Protection Tester License
d. CA UST Expert Certification
a. Tank Testing License
The annual Monitor Certification must be performed by ______.
a. The Designated UST System Operator
b. A person possessing the appropriate contractor license
c. An individual trained and certified by the manufacturer of the monitoring equipment
d. A person who meets the requirements of both b and c
d. A person who meets the requirements of both b and c
- All manufacturer’s certification must be renewed at the time interval recommended by the manufacturer, or ______ months, whichever is shorter.
a. 24
b. 48
c. 36
d. 12
c. 36
A “Service Technician” is defined as any individual who ______
a. Test UST Monitoring Equipment
b. Troubleshoots UST System components
c. Installs UST monitoring equipment
d. All of the above
d. All of the above
If manufacturer’s training and certification no longer exists the local agency may:
a. Require the affected components be removed and replaced with new equipment
b. Approve comparable alternate training or certification
c. Waive all training requirements
d. Fine the manufacturer
b. Approve comparable alternate training or certification