Study Guide Flashcards
How many hours ahead of time you need to notify agency that you will be performing a monitoring certification?
48 Hours
Technician performing a monitoring certification requires all the following except:
a. Tank Testers Certification
b. UST Equipment Installation Certification
c. Manufacturer’s Certification
d. CA UST Service Technician Certification
a. Tank Testers Certification
All of the following are approved secondary containment material except:
a. Isolated Steel
b. Stainless Steel
c. Cathodically Protected Steel
d. Fiberglass
b. Stainless Steel
A combustible detector measures the ________ of the area.
a. Flash Point
b. Specific Gravity
c. Oxygen Concentration
d. Ignition Point
a. Flash Point
Personal Protection Equipment does all except:
a. Provide eye protection
b. Provide protection against skin absorption
c. Provides protection against heat exhaustion
d. Provides hearing protection
c. Provides protection against heat exhaustion
All secondary containment must be tested at the time of installation and then ________.
6 months after installation, then every 3 years
Which of the following does NOT require Line Leak Detection?
a. Sloped Piping
b. Suction Piping
c. Pressurized Piping
d. Double-Walled Piping
b. Suction Piping
Shear valves are located ________.
Just under the dispenser
Suction piping valve is located ________.
Under the functioning pump
The word hazardous means any substance that can cause ________.
Harm
All of the following is true about hazardous waste storage except:
a. It requires are tight seal
b. It needs Hazardous Waste labeled on it
c. It needs a data accumulation started
d. It can be kept on site for 18 months
d. It can be kept on site for 18 months
Secondary containment testing results needs to be sent to the agency by the site owner/operator every ________.
3 years
The ________ performing the work is the one that fills out the monitoring certification form.
service technician
Dispenser investigation includes all of the following except:
a. Valves
b. Piping
c. Fittings
d. Meter Creep
d. Meter Creep
Secondary containment inspection should include all of the following except:
a. Cleaning debris from the area
b. Checking the position of the sensor
c. Removing liquid from the area
d. Making sure the boot on the pipe prevents fuel from dripping into the area
d. Making sure the boot on the pipe prevents fuel from dripping into the area
A site has Double-Wall tanks and Single Wall Lines, its overfill protection is the flapper valve. Which of the devices below does not need to be tested?
a. Line Leak Detector
b. ATG
c. Sump Sensors
d. Dispenser Sensors
b. ATG
__________ is the gas used for vapor systems.
Gaseous Nitrogen
Use ______ and pick up material and treat as hazardous waste to clean up a small spill.
absorbent
If cleaning water and fuel mixture out of an area you must treat is as ________.
hazardous waste
Definition of a tight tank is that it is capable of passing a _______ test.
0.1 GPH
Distance to the nearest hospital is NOT part of a ____________ plan.
confined space entry
ALL tanks and dispensers need to be listed on the _____ plan.
monitoring
For a tank being temporarily closed, structural ______ testing is NOT required.
integrity
All of the following can result in a fine except:
a. Falsification of information on monitoring cert
b. Tampering with a leak detection device
c. Disabling a leak detection device
d. Not replacing a faulty device immediately
d. Not replacing a faulty device immediately