Study Flashcards

1
Q

True or False:
A work center can take credit for a PMS check if 80% of the check can be completed?

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Who reviews, and approves via signature, the 13-week report?

A

DIVO, WCS, and LCPO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

The LOEP contains all of the following information except?

A

The periodicity code for each maintenance requirement

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

True or False:
An OPNAV 4790/CK is used to report discrepancies/deficiencies in the PMS system?

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

If more than one piece of equipment will be maintained by an MRC, the location Block will read?

A

See Location Guide List Below

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Who is the functional manager of 3M on the ship?

A

3MC (3M System Coordinator)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

To request a replacement for a lost or damaged MRC that is classified, the WCS should fill out a?

A

OPNAV 4790/7B (Category A)
*PMS FBR Non-Technical

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

An MRC card with a SYSCOM MRC Control Number A7 4ABG N has a production (birth) date of?

A

October 2017

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Which of the following is NOT an example of an IEM MRC?

A

U-1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Equipment is placed in IEM Status I whenever?

A

The equipment will not be operated for 30 days or more, but is NOT scheduled for corrective maintenance or overhaul.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Which document provides instructions and references required for use in the 3M System?

A

OPNAVINST 4790.4 (series)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Which form is used to document installation of new equipment?

A

OPNAV form 4790/CK

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Equipment should be placed in IEM Status II when?

A

Is inactive for 30 days or more AND is scheduled for corrective maintenance, overhaul, or removal for safe storage/placement.
*Refers to equipment that is repaired off ship.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Danger and Caution Tagout Audits are conducted how often?

A

Weekly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

What does an “C” beside a MIP number on the LOEP mean?

A

A Change to the MIP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

In SKED or on the 13-week report, M-1(#R-1) signifies what?

A

Monthly one has Mandatory Related Maintenance of R-1

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

The ships underway schedule can be viewed on which of the following tabs in SKED 3.2?

A

Events tab

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

How many weeks are in a quarter?

A

13 mostly, but sometimes 14

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

A semi-annual MR can be scheduled at what interval?

A

4-8 months

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

An annual MR can be scheduled at what interval?

A

3-5 Quarters

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

When a maintenance action cannot be fully accomplished, what must be submitted with your weekly 3M report, reflecting the non-accomplished maintenance?

A

A check note

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

The acronym PAR stands for what?

A

Periodic Accomplishment Rating

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

In SKED 3.2, hat will happen when attempting to mark a check complete, if no MP is assigned?

A

A pop-up window will appear, forcing you to assign at least one crew member, prior to marking the check complete.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

SNAP II was replaced by?

A

OMMS-NG

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

When using HAZMAT, information on proper PPE can be found where?

A

Both A and C
*MSDS/SDS and HMUG

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

In OMMS-NG, a JSN is created by?

A

Opening a work candidate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

When entering a 2K in OMMS-NG, what minimum information is required?

A

All items with a red check by them

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

True or False:
As a WCS, you can share your OMMS-NG access with someone else without giving them your LAN password?

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

In OMMS-NG, a job priority of Highly Desirable will require what category CASREP?

A

Cat 2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

In OMMS-NG, a job priority of Essential will require what category CASREP?

A

Cat 3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

In OMMS-NG, a job priority of Mandatory will require what CASREP?

A

Cat 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

When submitting a 2K in OMMS-NG that is assigned a priority of Highly Desirable, Essential, or Mandatory, where should the CASREP DTG and Serial be documented?

A

On the MISC tab

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

What will happen to regularly scheduled maintenance, when equipment is in IEM?

A

It will not appear on the boards, only PM checks will show up, if applicable.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

An Advance Change Notice (ACN) would be received when?

A

Whenever a change has been implemented to an existing maintenance requirement.

35
Q

Who is the Authorizing Officer for an equipment tagout for Engineering while underway?

A

COW
*Chief of the Watch

36
Q

What symbol indicates mandatory maintenance is required and must be accomplished concurrently?

37
Q

What does the acronym IEM stand for?

A

Inactive Equipment Maintenance

38
Q

True or False:
In the “Procedure” block, WCS may line out the non-applicable line items (Alternate procedures) that do no pertain to current equipment/configuration when the step is followed with the words “if applicable” or a Note identifying steps to be omitted?

39
Q

PMS schedules are produced using what computer program?

40
Q

What should be done (if anything) before the WCS, LCPO, and DIVO sign the completed 13-week report (accountability log)?

A

Log in to SKED, verify that the correct maintenance was done and checked off by the person signing, and that it is marked complete in SKED the same day that it was signed for.

41
Q

True or False:
The Department Head signature on Quarterly and Cycle boards has been replaced in SKED 3.2 with an electronic approval process for revisions.

42
Q

Submitting a 4790/CK for a newly installed piece of equipment will initiate support to include?

A

-PMS, Tech Manuals, COSAL
**All of the above

43
Q

Shipboard divisions may have E7 and senior who are responsible for multiple Work Centers. These CPOs are designated by the CO as?

A

Group Supervisors

44
Q

While reviewing your PMS schedule in SKED 3.2, you notice that the line item is highlighted in yellow. What does this signify?

A

The MR is nearing the end of its maximum range (within a week)

45
Q

True or False:
Maintaining a Work Center RPPO log is optional?

46
Q

What is the maximum periodicity of a 2W MRC?

47
Q

What is the maximum periodicity of a 3W MRC?

48
Q

What is the maximum of a weekly (W) MRC?

A

Every week

49
Q

What does the word CASEEP mean?

A

Casualty Report

50
Q

How many types of CASREPs are there?

51
Q

What type of CASREP report is submitted when a system has been restored to full operational status?

52
Q

When ordering using an Open Purchase request, what is the maximum dollar amount allowed for one request?

53
Q

Who is the final approving authority, by signature, for the RIP chit?

54
Q

What would be an example of a Consumable Item that is to be ordered using the “Non-Maint Supplies” menu in OMMS?

A

Hand tools

55
Q

What must you bring when you are trying to order a DLR?

A

DLR (or RIP chit), RPPO log, 2K

56
Q

If you turn-in a Circuit Card assembly or a Power Supply, what additional report must be provided to Supply?

57
Q

Who is responsible for providing the quote for open purchase requests?

A

-the divisions RPPO; the request originator
**Either A or C

58
Q

What is a 5-digit code used to identify the manufacturer of a part?

59
Q

What publication is the MILSTRIP/MILSTRAP desktop guide?

A

NAVSUP P-409

60
Q

An “URGENT” TFBR leaves the ship….?

A

By message

61
Q

What are the 3 general purpose APL’s?

A

X-SYSTEMITEM, X-SERVICEITM, X-COMPARTMNT

62
Q

What Command is used to finalize a deferral, completed, or change work candidate?

63
Q

True or False:
The intent of the PMS Spot Check program if for Quality Assurance of equipment and 3M training of PMS procedures and documentation.

64
Q

What is used today in place of an OPNAV 4790/2K?

A

Work candidate

65
Q

What color ink will be used on the Quarterly schedule to indicate lay-up maintenance?

66
Q

Under “Lead/Assist” tab in OMMS, what work center would be selected to respond to potable water trouble calls?

A

EA02 (Steam & Heat shop)

67
Q

What are the 5 common tool bar functions in OMMS-NG window?

A

Exit
New
Open
Print server
New list

68
Q

True or False:
Login and password are required to access OMMS-NG?

69
Q

An MRC with a periodicity code of “2W-12” is required to be completed?

A

Every 2 weeks

70
Q

What Assist work center would you select to defer maintenance for repairs on a Departmental Wooden Picture board?

A

ER02 (Carpentry Shop)

71
Q

What type of citation warrants the submission of an “Urgent” feedback report?

A

When the subject matter involves a Safety Hazard

72
Q

Your work candidate requires assistance to complete the task other than the OWC. What tab would the user select to assign an assist work center?

A

MA Planning

73
Q

True or False:
3M weekly reports are due to the 3M office by 1130 on Tuesday.

74
Q

True or False:
Requests for work package additions can be done using the ships OMMS-NG maintenance module (i.e. MA Planning)

75
Q

The purpose of internal work processing is to….?

A

Provide all functions necessary for documenting deficiencies noted and repaired onboard the ship

76
Q

The computer SERVER providing support for functions specifically related to Supply and Financial Management is?

77
Q

Reviewing MRC’s and promptly submitting PMS feedback reports is the responsibility of the?

78
Q

How often is an equipment validation conducted IAW LINCOLNINST 3120.1D?

79
Q

Which of the following is used to verify an MRC?

A

MRC to MIP, MIP to LOEP, LOEP to Record of Change Page (also called FR)

80
Q

A blue flag on a master tagout line item indicates the tagout?

A

Is authorized to be removed

81
Q

The JSN is 4-digit number used to?

A

Identify the WC submitting a maintenance action.
Report parts/material that are not on hand.
Reports uncorrected deficiencies reported by INSURV.
**All of the above

82
Q

What does EIC mean?

A

Equipment Identification Code

83
Q

In the OMMS-NG system, printed CSMP summary reports are a function of the?

A

Reports Tool Bar Option

84
Q

How long are quarterly close-outs kept on file and by whom?

A

1 year; Dept 3MA