Strip Shopping Flashcards
On a strip shopping center smaller stores could have dimensions of ________ and larger stores could have a width of _______
30x75 feet
150 feet
Initial fire flow on a strip shopping center should be ______ per 100 square feet
20
Most shopping centers were built how many years ago?
30 to 40
On a strip shopping center collapses generally involve what?
The roof and cantilever facades or marquees
At what temperature will steel begin to twist and expand
1000 degree
On stop shopping center a fire burning for 20min in ordinary and 10 min in lightweight are signs of what
Imminent collapse
Which engine should supply the buildings fire protection systems.
Second Engine
When multiple unmarked connections are present what should you do?
Ensure all connections are charged.
The third due engine should position were on a strip shopping center?
The rear and support the rescue and truck.
The first due truck should position where on a strip shopping center
The front for ground ladder deployment, master stream, and ground ladders
The second due truck should position where with their primary assignment of gaining access to the roof
2nd
Primary position in the front must go to what if on the initial dispatch?
Tower
How man GPMs would it take to surprise a fire in a strip shopping center that’s 25x50 and 1250sqft?
250
When should master streams be strongly recommended?
When fires have reached advanced stages and there is no life hazard.
On a flat built up roof when cutting a hole, you should remove the footing materials ____ larger then the cutting hole
1x1.
If you want a hole 4x4 remove the material 5x5