Steel construction 2 Flashcards
1
Q
The perliminary framing layount of a building is genrally prepared by the
A
project arhitect
2
Q
A snug tight connection between framing members is obtained by
A
bolting the memebrers and tightning them with a spud wrench using full force
3
Q
Field bolting of steel memebrs is genrally prefered over wielding
A
true
4
Q
In a multistory steel frame building, the columns are generally spliced
A
every two floors
5
Q
in a column spliced detail, a butt plate is required when
A
the upper story column is muhc smaller in height than the lower story column
6
Q
The fabrication of structural stell components is done based on
A
shop drawings
7
Q
To level a column so that it is plumb
A
leveling bolts are used