Act 407 of 2016(Skilled TRades Regulation Act), Act 230 of 1972(Construction Code Act) Part 8 for adoption and amending the NEC. Michigan Residential Code
A wiring method not permitted to serve as an equipment grounding conductor in a commerciall building is:
Flexible metal conduit is not permitted for grounding
Michigan Public Act 230, Part 8 omits 250.118(6)
An applicant for an electrical permit is required to also submit a detailed set of plans with specifications if:
The service or feeder is more than 400A and a building area is greater than 3500 sqft
90-22 part 8, Construction Code Act
An inspection agency is required to be notified of a request for inspection of electrical wiring or equipment in advance of not less than:
24 Hours
90-25 of Part 8, Construction Code Act
If inspection of an electrical installation results in notification of the installer that there ia a lack of compliance of the code that required inspection, the installer is required to correct the noncompliance and notify the inspection agency:
No specific time is specified
90-31 Part 8, Construction Code Act
A person, firm, or corporation is required to be licensed to install any electrical wiring other than minor repair work which means wiring not in excess of a valuation of:
$100
Skilled Trades Regulation Act
An electricall contracting firm must not have less than one master electrician residing in this state who is full-time employed by the firm. A master electrician is permitted to serve as the required master electrician for:
Only one electrical contracting firm