Site Development Flashcards

1
Q

Construction Site Layout & Surveying:
Benchmark?
Backsight?
Foresight?
Equations relating each other?

A

Benchmark = permanent point of known elevation
Backsight = elevation difference using level rod to known point
Foresight = elevation difference using level rod of unknown point
TP = HI - FS
HI = BM + BS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

OSHA/EPA requirements:
Permit required if how much land is disturbed?
What height of platform are railings required?

A

1 acre of disturbed land requires permit
platforms greater than 6 ft above ground require railing