Single stage job calculations 2 Flashcards
name the critical values in a single stage calculation?
Dimensions and capacity of the open hole and casing
Annular volume of the casing in open hole and in previous casing
Cementing information such as API slurries and density of additives
Absolute volume information
Name the section of your Field Data Handbook where yo can find information Cement Slurry Properties Outside diameter displacement of tubing and drill pipe Drillpipe displacement bbl/ft Density of additives Slurry volumes Capacities - holes Capacities-tubing, drillpipe, casing.
Section 3 Capacities (tubing drillpipe casing and holes), drillpipe displacement and OD displacement of tubing and drill pipe
Section 5 Slurry volumes
Section 7 Density of additives and cement slurry properties.
Is the volume between the collar and the shoe important in single-stage calculations?
Yes
Is the volume of the open hole below the casing shoe critical to single stage calculations?
No, (the vol in the rathole), the mud in the rathole tent to maintain there and the cement to go upward
how many times more water the prehydrated bentonite absorbs than the conventional one?
4 times
How much volume must be overdisplacement for a shoe track?
1/2 of the volume capacity
how Yield slurry is changed?
by modifying the solid-to-liquid ratio of the cement slurry by adding water.
what do total water requirement include?
Mix water needed (+20% safety margin)
Dead volume of the tank (mix fluid)
Water for washes spacers and displacement
20 bbl for priming and washing up
what is the total time in a cementing job?
the minimum thickening timer for the slurry to be used
what does the estimated time for cementing operations include?
Mixing Time
Displacement Time
10 min for plug drops and other activities
1 hr safety margin
How does the minimum thickening time must be?
the greater of 1.5 times the job’s time
or plus 2 hr
How many gallons a barrel is
42 gal/bbl
how many gallons a ft3 is
7.48 gal/ft3
Which of the next statements apply when ensuring water quality for a cementing job?
- Test cement and additives from samples supplied to the lab by manufacturer
- Perform lab test with the same water used during cement job.
- Use clean water from the site to test cement in laboratory.
- Run a confirmation lab test immediately prior to cementing
- Perform lab test with the same water used during cement job.
- Use clean water from the site to test cement in laboratory.
- Run a confirmation lab test immediately prior to cementing
are displacement volume calculations affected in any way by the ID sampling of pipe lots?
yes