Session 6 Flashcards
IBC 108 -116
It shall be the duty of the __________ to notify the building official that work is ready for inspection.
permit holder
Who is authorized to revoke a Certificate of Occupancy?
The building official
Which of the following in not specifically identified as a required inspection under the IBC?
roof covering
The building official has the authority to authorize disconnection of utility service to the building
to eliminate an immediate hazard to life or property
In flood hazard areas, documentation of the elevation of the lowest floor submitted to the building official prior to
final inspection
Gypsum board that is part of a fire-resistance rated assembly must be inspected prior to
taping
The required energy efficiency inspection specifically includes verifying all of the following except
sealing against air leakage
Final building permit valuation shall be set by the
building official
the code specifically requires temporary structures to conform to the requirements for all of the following except
life safety
The members of the board of appeals shall be appointed by the
governing body
Which of the following information is not requited on the CO?
name of architect in responsible charge
which of the following is not required to be completed at the time of framing inspection
insulation
which of the following is not a reason to revoke a CO?
The owner has sold the building to a new owner
Causing work to remain accessible and exposed for inspection purposes shall be the responsibility of the
owner
The building official is authorized to accept the reports of approved agencies provided the are
qualified and reliable
A stop work order shall be in writing and given to any of the following individuals except the
plans examiner
The board of appeals shall have no authority to
wave code requirements
Unsafe conditions in a structure include
inadequate light and ventilation, a fire hazard, unsanitary conditions