An application for permit shall be considered abandoned how may days after filing unless the application has been pursued in good faith or a permit has been issued?
180
Which one of the following types of work is specifically allowed to be covered under and annual permit?
alteration to an already approved mechanical installation
If no work is commenced on an approved permit, it shall expire after ( blank) days.
180
Which of the following types of work does not require a building permit?
7 foot high solid masonry fence
The (blank) shall keep a detailed record of alterations made under an annual permit.
permit holder
According to the IBC, “Approved” means acceptable to the
Building official
An application for a permit that exceeds the time limit from the date of filing may be extended for maximum periods of how many days when authorized by the building official.
90
The maximum allowed area for an accessory storage structure that does not require a permit is how many square feet?
120
A permit is not required for
connection of approved portable electrical equipment
Which of the following is not specifically required on the application for permit?
general contractor of record.
Which of the following conditions is not specified in the code as a reason to revoke or suspend a permit?
a contractor’s license was suspended
In the submission of construction documents, which of the following is not specifically required by the code to be included on the site plan?
roof height of new construction
The building official is responsible for examining applications for permits within how many days after filing?
a reasonable time
Changes that are made during construction that are not in compliance with the approved construction documents shall be
resubmitted for approval as an amended set of construction documents
Deferral of any submittal items shall have prior approval of the
building official
When the repairs must be performed in an emergency situation, the permit applications shall be submitted to the building official within
the next working business day
When construction documents are approved in the issuance of a permit, the documents shall be identified, in writing or by stamp as__________
Reviewed for code compliance
The registered design professional in responsible charge shall be responsible for
reviewing submittal documents prepared by others
Which of the following requires a permit?
replacing a section of leaking plumbing pipe.
Not:
portable appliances or clearing of a major stoppage in underground sewer pipe
which one of the following sequence of events is correct?
receipt of application, review of construction documents, issue of permit
The building official is authorized to waive the submission of construction documents if the e
review of construction documents is not necessary to obtain code compliance
Fire protection system shop drawings shall be
approved prior to the start of the system installation
The building permit or a copy shall be
kept on the site of the work
For an above-ground prefabricated pool accessory to a group R-3 dwelling to be exempt from the permit requirements, the code limits the pool to a water depthless that ________ inches and a capacity not greater that ___________ gallons.
24; 5,000
Unless state or local law mandates a different time period, at least one set of approved construction documents shall be retained by the building official for at least ____________ days after completion of the permitted work.
180