1
Q

What are the benefits of decreasing the velocity (and turbulence) of the moving water in sediment control?

A

Decreasing velocity will reduce the ability of the water to transport sediment and reduce the ability of the run-off to detach soil particles.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are “Sediment Traps”

A

They are small temporary structures used at various points of distrubed areas to detain run-off for a short period of time and trap heavier sediment particles.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What are the two types of sediment ponds (basins)?

A

Dry basin and wet basin.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What is a dry basin as it pertains to sediment control?

A

A basin used to trap sediment in an off-stream location that is dry most of the time.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is a wet sediment basin as it pertains to sediment control?

A

It’s a structure created to impound water for the purpose of settling sediment in the run-off.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is meant by “Overflow Rate”?

A

The ratio of pond discharge to the surface area of the pond.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What will happen to the overflow rate if the flow rate of water to a basin is unchanged, but the area of the basin is increased?

A

The overflow will decrease and smaller particles will be settled out.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What factors could disturb efficient settling of particles in a basin?

A

Short circuiting, bottom scouring, turbulence, non-uniform deposition, entrance and exit effects, irregular shape of the suspended material.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What is the function of baffles in a pond?

A

To increase uniformity of detention time and to provide full utilization of the pond (or reduce short circuiting).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What will the effect of partitioning a pond into a number of chambers and allowing water to overflow from each chamber along the entire width be?

A

This can improve pond performance in retaining suspended solids, because it will reduce short circuiting.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Maximum efficiency of a rectangular sediment pond can be expected at a certain length-to-width ratio. What is the optimum ratio?

A

Length to width= 5:1.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

What can construction of an energy dissipator in the sediment pond entrance reduce?

A

Influent velocity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Modifying the inflow to the sediment basin so that the flow enters along the entire _______ of the basin, as much as possible, can increase the suspended solids removal efficiency of the basin.

A

Width.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Wrapping a plastic filter cloth around a standard PERFORATED riser can increase the retention of what kind of material?

A

Fine-grained.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Why is it preferred to have a very wide overflow weir instead of a standard riser pipe for the solids removal effeciency of a sediment pond?

A

It will reduce the outflow velocity of the water.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Two or more ponds used in series, instead of one large basin covering the same area, have been shown the increase the removal efficiency. One reason for this improvement is _________________________.

A

Reduction of short circuiting.

17
Q

Short circuiting is undesirable in a sediment basin. What is short circuiting?

A

A hydraulic condition occuring in part of a basin where the time of travel is less than the theoretical flow-through time.

18
Q

All sediment containment structures require an inspection after major __________?

A

Rainstorms.

19
Q

What is the most important maintanence need for a sediment containment basin?

A

The removal of accumulated sediment.

20
Q

A general rule that can be used the determine when to clean out a sediment basin is:

A

When the sediment basin has reached 50% of its sediment storage capacity or six months after the mining operation was started.

21
Q

Small quantities of sediment from a sediment basin may be disposed of by:

A

Burial in the active pit or disposal by dewatering and covering with soil and vegetation.

22
Q

Large quantities of sediment from a sediment basin may be disposed of by:

A

Special provisions should be made to either bury it in an area designated for that purpose, or to stockpile, dewater, spread, adequately cover, soil stabilized, and vegetate it properly.

23
Q

Accumulated sediment that will be left in place after mining is completed, should be?

A

Spread, covered with topsoil, and vegetated, or stabilized by mechanical means, to prevent it from eroding back into the stream.

24
Q

Once surface mining is complete, what should be done with an earth bank built across a natural drainage way?

A

The embankment and all accumulated sediment should be removed to a predetermined area within the mine property and the area where the embankment was soiled, stabilized, and vegetated properly.

25
Q

What is a “Check Dam”?

A

It is a small dam constructed in a gully or other small water course to decrease the stream flow velocity, minimize channel scour and promote deposition of sediment.