Sector 3 Road Knowledge Main North Line Flashcards
Which platform/s at Hornsby allow up journeys via the north main?
Platforms 1 – 4
When travelling from Asquith which platform/s at Hornsby can you terminate on and return to Berowra?
Platforms 1 – 5
Which platform/s can be reached at Hornsby from turnback 1?
Platforms 3 & 4
Which platform/s can be reached at Hornsby from turnback 2?
Platforms 2 – 5
Which platform/s can you terminate on at Hornsby from the down main?
Platforms 1 – 5
What are the terminating stations between Strathfield and Berowra via the main?
Strathfield, Nth. Strathfield, Concord West, Rhodes Eastwood, Epping, Cheltenham, Hornsby, Asquith, Berowra
What is the system of safeworking on the down relief between North Strathfield and Concord West?
RVDS Two way running
Which platform/s can you terminate on at Rhodes in the down and return on the up?
Platforms 2 & 3
Top green on WR 7 the 1st signal after West Ryde is the PONR for what moves?
Terminating at Eastwood platform 3
Terminating and return directly at Epping
Terminating Epping turnback
How do you terminate at Eastwood on the up and return on the down?
Detrain at platform 2 shunt towards Denistone past EW 13 and return through platform 3
What is the PONR to terminate at Eastwood on the up north suburban?
EG 36 the 1st signal after Epping platform 1
How do you terminate at Rhodes on the up and return on the down?
Detrain on platform 1 shunt towards Concord West past RS15 return through platform 2 or 3
What is the method of safeworking over the inward and outward roads between Hornsby station and Hornsby M/C?
Yard working
If the inward or outward road is blocked how are trains worked into and out of Hornsby M/C not including over the top?
Special yard working using telephone communication between the shunter and signal box
If communications break down during special yard working how are trains worked in and out of Hornsby M/C?
All trains must be piloted by a shunter with a maximum speed of 15 kp/h