Section Review Flashcards

1
Q

Where are the stop valves located? What is the purpose of the valves ? Where are the lead lines?

A

The stop valves are located at the front of the steamer, the purpose is to isolate steam to st84, and the lead lines are on the mid deck upstream of the stop valves

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What are the two sources of water that you have in the surface condenser?

A
  1. Condensate/polished H20
  2. CTW
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

State the hazards to plant personnel when operating around high pressure steam and or hot condensate 

A

Burns, noise, water hammer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

State the steps necessary to put the cooling tower water system in service, on the following systems.
A. The a and B vacuum skid (plate and frame)
B. Exciter cooler

A

A. Open ctw inlet/outlet on E8406A/B. Open inlet/outlet on seal water E-8405A/B.
B. Open inlet/outlet on E – 8409 and vent discharge through tube drains.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

State where can the contaminated hotwell condensate go when it is dumped?

A

It’s lined up to the polished water tanks but it can goto the West ditch and condensate tanks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

State what role the surface condenser has in the hotwell condensate system

A

Condenses exhaust steam from ST 84 and provides cooling from cooling tower to maintain vacuum

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Briefly described the function or purpose of each of the following valves.
A. P 8401A suction and discharge valves.
B. P 8401A recirculation valve.
C. P 8401A condensate dump valve.
D. Check valve

A

A. Isolation valves
B. Maintain hotwell level and flow
C. Dumps on high conductivity
D. Prevents backflow

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

State the purpose of the hotwell makeup condensate line.

A

Adds polished water to hotwell for st84 start up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

State the purpose of the oil conditioning system.

A

Removes water and impurities from oil.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Describe the purpose of the jacking oil system.

A

Provides extra oil pressure to keep the shaft from “sagging” during start up shutdown of st84

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Describe the operation and function of E-8402.

A

Condenses gland seal leak off and sends it back to the condenser. gland seal fans provide vacuum to support steam flow

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

State the purpose of E 8402 drain line level switch high

A

Alarms when high level in gland seal condenser

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Describe the hazards associated with improper steam line warm-up

A

Water hammer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

State what is used for cooling on the vacuum skid?

A

Aux cooling water

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

State the function of the following items
A. Inter condenser condensate trap
B. Steam jets on vacuum skids

A

A. Maintains level in inter condenser and returns water to hotwell condenser.
B. Creates vacuum using 300 pound steam establishes/maintains vacuum in condenser.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Describe the function of the hydraulic oil on the ST 84 turning gear

A

Used to control steam control valves, opens stop valves, engages turning gear pinion

17
Q

State the hazards of hydrogen

A

Highly flammable with oxygen

18
Q

State the hazards of CO2

A

Asphyxiation

19
Q

State why hydrogen purity in the generator is important

A

Cooling efficiency keeps from damaging windings and produces more megawatts

20
Q

State hazard involved while performing this job
A. Purging the generator with CO2 from hydrogen.

A

A. Oxygen displacement/valve alignment.

21
Q

State the results of low hydrogen pressure if it continued to be low

A

Less cooling, seal oil could get into the generator

22
Q

Explain why the seal oil pressure is run higher than the hydrogen pressure

A

To trap the hydrogen in the generator

23
Q

State the reason why it’s a good idea to check the hydrogen bank pressure each time you make a round

A

To ensure adequate supply/identify leaks early

24
Q

Describe the purpose of D 8405 and D 8406

A

Used to de gas hydrogen/oil mixture from generator oil seals

25
Q

State the control range for the hydrogen to seal oil differential pressure

A

8-10 psi

26
Q

State the normal control range for the seal oil pressure

A

70-80 psi

27
Q

List the hazards involved with work being done on the bridge crane

A

Slip strips and falls, falling debris, electrical shock

28
Q

Explain the purpose of the bridge crane

A

Assist with turbine outages lifts equipment related to turbine

29
Q

State the permit limits for blowdown water from cooling tower.

A

7 to 9 pH
0 to 45 TSS
0 to 50 TOC

30
Q

Describe the location of CT 84 blow downs and explain how they are used and controlled

A

West side of polisher building and it’s controlled on conductivity readings

31
Q

List the tanks and vessels associated with the cooling tower area (detergent, corrosion inhibitor)

A

Sulfuric acid, bleach and Nalco tanks

32
Q

A. state the upper and lower limits for cooling tower pH
B. list the results of high ph excursion and low ph excursion.

A

7.5-7.8
Low ph- corrosion of condenser tubes
High pH- plugging of exchanger tubes

33
Q

Explain the procedure for startup of a cooling tower circulating pump and putting the 54 inch cooling tower water header and associated equipment service

A

First verify cooling tower level, verify proper lineup, check pump oil levels, verify discharge vents and condenser vents open, check discharge valve position is at 20%, verify cooling tower riser is open, start pump, verify sealwater flow, close vents Open discharge 100%, balance risers to fans

34
Q

List the steps for preparing the cooling tower fan for maintenance

A

Shut down fan, place HOA in off, open switch gear, install fan brake, bump test, hang isolation

35
Q

Explain the established procedure for performing the total chlorine sample analysis

A

Catch sample, rinse 25 mill bottle, fill 2 25 mil bottles, add reagent, read sample