Section 3 - Site planning and management Flashcards

1
Q

6 main factors that influence erosion?

A
  1. Rainfall characteristics
    2.Soil erodibility
  2. topography
  3. vegetative cover
  4. Season
  5. Climate
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

5 main challenges associated with urban development?

A
  1. Lack of communication
  2. Large increase in soil disturbance
  3. Improper construction sequence
  4. Changed hydrology
  5. Lack of maintenance
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

5 parts of a SWPPP?

A
  1. Site evaluation
  2. Practice and plan design
  3. Specification
  4. Certification and notification
  5. Construction and plan implementation
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

SWPPP site evaluation 3 components?

A
  1. Site conditions
    -disturbance area
    -existing and new slopes
    -drainage area and patterns
    -hydrology
    - soil types
  2. Resources
    -onsite vegetation to protect
    -onsite/offsite water bodies to protect
    -Pre-existing improvements to protect and use
  3. Risk
    -Assess construction activity and potential for pollutants
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

SWPPP Practice and plan design 5 components? (management)

A
  1. Manage communication
  2. Manage work
  3. manage water
  4. manage erosion
  5. manage sediment
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

SWPPP Practice and plan design 6 components? (Plan)

A
  1. Plans for wet weather, inspection and reporting (communication)
  2. Plans for phasing and sequencing (work)
  3. Plans for diversion and dewatering (water)
  4. Plans to limit and delay disturbance (sequencing)
  5. Plans to achieve permanent stabilization (erosion)
  6. Plans to capture sediment during active work (sediment)
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

7 phases of construction?

A
  1. Clearing and grubbing
  2. Site access
  3. Mass grading
  4. drainage construction
  5. channel construction
  6. vertical construction
  7. final stabilization
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

BMP for clearing and grubbing phase?

A

Preserve as much existing veg as possible

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

BMP for mass grading phase?

A

Principle basins, traps and barriers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

BMP for site access and off-hauling phase?

A

Stabilize and limit ingress/egress points

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

BMP for mass grading phase?

A

Stabilize basins, manage concentrated run on and runoff through the site

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

BMP for channel construction?

A

Monitor weather, install grade controls, stabilize stream banks early

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

BMP for final stabilization phase?

A

Apply temporary or permanent stabilization measures immediately on disturbed areas

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

BMP for vertical construction phase?

A
  • Protect existing measures
  • modify plans to show new conditions and updated measures
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

SWPPP plan implementation 6 components?

A
  1. implement the practices
  2. inspect and maintain the practices
  3. maintain records of activities
  4. Update the SWPPP
  5. Respond to spills
  6. Ensure plan is accessible