Section 3 - Site planning and management Flashcards
6 main factors that influence erosion?
- Rainfall characteristics
2.Soil erodibility - topography
- vegetative cover
- Season
- Climate
5 main challenges associated with urban development?
- Lack of communication
- Large increase in soil disturbance
- Improper construction sequence
- Changed hydrology
- Lack of maintenance
5 parts of a SWPPP?
- Site evaluation
- Practice and plan design
- Specification
- Certification and notification
- Construction and plan implementation
SWPPP site evaluation 3 components?
- Site conditions
-disturbance area
-existing and new slopes
-drainage area and patterns
-hydrology
- soil types - Resources
-onsite vegetation to protect
-onsite/offsite water bodies to protect
-Pre-existing improvements to protect and use - Risk
-Assess construction activity and potential for pollutants
SWPPP Practice and plan design 5 components? (management)
- Manage communication
- Manage work
- manage water
- manage erosion
- manage sediment
SWPPP Practice and plan design 6 components? (Plan)
- Plans for wet weather, inspection and reporting (communication)
- Plans for phasing and sequencing (work)
- Plans for diversion and dewatering (water)
- Plans to limit and delay disturbance (sequencing)
- Plans to achieve permanent stabilization (erosion)
- Plans to capture sediment during active work (sediment)
7 phases of construction?
- Clearing and grubbing
- Site access
- Mass grading
- drainage construction
- channel construction
- vertical construction
- final stabilization
BMP for clearing and grubbing phase?
Preserve as much existing veg as possible
BMP for mass grading phase?
Principle basins, traps and barriers
BMP for site access and off-hauling phase?
Stabilize and limit ingress/egress points
BMP for mass grading phase?
Stabilize basins, manage concentrated run on and runoff through the site
BMP for channel construction?
Monitor weather, install grade controls, stabilize stream banks early
BMP for final stabilization phase?
Apply temporary or permanent stabilization measures immediately on disturbed areas
BMP for vertical construction phase?
- Protect existing measures
- modify plans to show new conditions and updated measures
SWPPP plan implementation 6 components?
- implement the practices
- inspect and maintain the practices
- maintain records of activities
- Update the SWPPP
- Respond to spills
- Ensure plan is accessible