Section 2 Chapter 1 Flashcards

1
Q

amount of time it takes for additional resources to be requested and dispatched and to reach the scene and achieve fireground objectives

A

reflex time

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

ongoing process of evaluating a situation to determine what has happened, what is happening, what is likely to happen, and what resources will be needed to resolve the situation

A

size up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Lloyd Layman’s 5 step process for analyzing any emergency situation

A
  1. Facts
  2. Probabilities
  3. Own Situation
  4. Decision
  5. Plan of Operation
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

3 step size up process

A
  1. Locate
  2. Isolate
  3. Mitigate
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

an uncontrolled situation that requires immediate action

A

emergency

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

RECEO-VS

A
  1. Rescue
  2. Exposures
  3. Confinement
  4. Extinguishment
  5. Overhaul
  6. Ventilation
  7. Salvage
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

the incident priority of stabilization occurs during the ___________ phase of RECEO-VS

A

extinguishment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

common strategies for structural fire fighting

A

RECEO-VS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

_____ are the specific assignments from Division/Group Supervisors to accomplish the defined tactics

A

tasks

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

if aerial ladder is to be used, spot the truck at a _______

A

corner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

the area between the hanging (suspended) ceiling and the roof is called the ________

A

plenum

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

steel can elongate ____ inches in a 100 ft. span

A

8

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

when fire is on an upper floor of a multistoried building, the salvage company should attempt to hold the water to the floor ___________

A

below the fire

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

salvage company begins salvage operations …….

A

as close to the fire as possible

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

secondary salvage company should begin salvage on the floor……………

A

below the fire floor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

always shut off utilities when working in a _____________

A

confined space

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

process of ventilating areas by means of windows, doors, and other horizontal openings

A

cross ventilation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

__________ construction uses structural members that depend on size for strength

A

conventional

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

type of construction where strength is obtained from multiple members that are in compression and tension

A

lightweight

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

a single lightweight truss structural member can span ___ ft.

21
Q

Gable roof rafters are usually 2x6 or larger and are usually ____ to ____ inches on center

22
Q

Ridge board on gable roofs is usually a ________

23
Q

lightweight construction uses _______ or ______ inch wood trusses held together by metal gusset plates

24
Q

trusses share common features such as _________, ____________, and __________.

A

top chords, bottom chords, webbing

25
most common metal gusset plates are _____ gauge steel plates with prongs that produce ____ inch penetration
18, 3/8
26
____________ may provide some stability for interior partition walls
roof truss clips
27
common on-center spacing for truss rafters is ____ inches
24
28
wooden truss members in bridge truss roofs are built with _______ inch lumber
2x12
29
bridge truss roofs, predictably fail in _________
sections
30
roof patterned with an egg crate, geometric, or diamond design.
lamella
31
type of arch roof supported by exterior buttresses or internal tie rods with turnbuckles
lamella
32
lamella roofs will have total collapse if fire removes ____ % of the roof structure
20
33
type of arched roof that uses metal tie rods for lateral support for the walls of the building
tied truss arch roof
34
wooden I beam roof, the top chord is in ____________ and the bottom chord is in __________
compression, tension
35
common on center spacing for I beam roofs is ____ inches
24
36
roof construction that uses web members between chords from 1 to 2 inch cold rolled steel
open web roof
37
beams on panelized roofs can be spaced between ____ and ____ ft. apart.
12, 40
38
beams may be bolted together on panelized roofs to provide lengths well in excess of _____ ft.
100
39
in panelized roofs, purlins are installed with metal hangers on ___ ft. centers
8
40
a common size for a purlin is _____
4x12
41
panelized roofs have _______ measuring 2x4 inches by 8 feet and are installed on 24" centers
joists
42
a steel or wool substructure is covered by corrugated metal. a mixture of sand, cement, and pea gravel is pumped on top of the metal decking.
lightweight concrete roof
43
steel loses its tensile strength at ______
1000°
44
when exposed to heat, metal beams can expand ___ inches per 100 ft.
9
45
Tilt up concrete construction can be up to ___ stories high
5
46
in unreinforced masonry buildings, one row of brick will be laid on end every 4th to 7th row. this is called...
kings row
47
identifiable style of construction on the exterior of a building that will conceal and spread the travel of fire. "external attic"
facade
48
construction with no horizontal fire blocking in the walls
balloon