Section 2 Cascade Control Flashcards
In a cascade control system, which controller (primary / secondary) controls the process?
Primary
In a cascade system, the control valve receives its signal from which controller (primary /
secondary)?
Secondary
When should a cascade control system be applied to a process?
1) Manipulated variable disturbances
2) Naturally continuous disturbances
To properly tune a cascade control system, which controller should be tuned first (primary /
secondary)?
Since the secondary controller interacts with the process first it will be tuned first
For a process to be a good candidate for cascade control, the secondary loop’s period must
be how many times longer than the primary’s?
Minimum 3 times longer
Explain how to tune a properly designed cascade control scheme.
1) Tune secondary controller:
Primary in MAN (disconnected)
Secondary in AUTO
2) Tune Primary controller:
Primary in AUTO
Secondary in Cascade
State two advantages of cascade control.
1) Faster response to manipulated variable disturbances
2) Secondary control loop can help reduce non-linearity