Section 2 Flashcards

1
Q

Section 2

A

Laws, regulations and site conditions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Section 3

A

Equipments and materials

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Section 4

A

Premises and temporary structures

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Temporary structures

A

• office and contractor’s building
• housing for workers
• sanitary fixtures and 1st aid station
• temporary barricades and guard lights
• temporary water, power and telephone facilities
• temporary signs
• temporary roadways
• temporary stairs, ladders, ramps, and runways
• temporary elevators and hoists
• temporary enclosures
• temporary or trial usage
• removal of temporary structures

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

wooden floor raised above ground; room
of approx. 12 sq.m. for the architect,

A

Office and contractor’s building

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

tents or protection on designated areas.

A

Housing for workers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

ample sanitary toilets and other
conveniences including water connections.

A

Sanitary fixtures and 1st aid station

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

necessary for proper prosecution
and completion of work. Lights located at false work tower to be provided by
contractor.

A

Temporary barricades and guard lights

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

provided by contractor
through arrangements with local utility companies. All expenses paid by the
contractor

A

Temporary water, power and telephone facilities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

no advertisements to be displayed without architect’s
approval.

A

Temporary signs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

provide proper access

A

Temporary roadways

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Section 5

A

Protection of work and owner’s property

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Section 6

A

Labor, work and payments

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The architect may recommend withholding of payment on any of the following:

A

• defective work not remedied
• reasonable evidence indicating probable filling of claims
• failure of contractor to make payments to sub-contractor or for material and labor.
• reasonable doubt that the contract can be completed for the balance then unpaid
• damage to another contractor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

The contractor shall submit the following before final payment is made:

A

• certificate of final building occupancy
• certificate of final inspection of utilities
• original and 3 sets of prints of “as-built drawings “ of electrical, sanitary, gas, telephone, and mechanical works
• 3 copies of directory of panel boards and list of circuits.
• 3 copies of instructions and manual for operating fixtures and equipment.
• 3 copies of keying schedule
• Guarantee bond equivalent to 30% of the contract price covering a period
of 1 year after the final acceptance of the work.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Section 7

A

Contractor-separate contractor-sub-contractor relationship

17
Q

Section 8

A

Suspension of work and termination of the contract

18
Q

Section 9

A

Responsibilities and liabilities of contractor and of owner