Section 2 Flashcards
Section 2
Laws, regulations and site conditions
Section 3
Equipments and materials
Section 4
Premises and temporary structures
Temporary structures
• office and contractor’s building
• housing for workers
• sanitary fixtures and 1st aid station
• temporary barricades and guard lights
• temporary water, power and telephone facilities
• temporary signs
• temporary roadways
• temporary stairs, ladders, ramps, and runways
• temporary elevators and hoists
• temporary enclosures
• temporary or trial usage
• removal of temporary structures
wooden floor raised above ground; room
of approx. 12 sq.m. for the architect,
Office and contractor’s building
tents or protection on designated areas.
Housing for workers
ample sanitary toilets and other
conveniences including water connections.
Sanitary fixtures and 1st aid station
necessary for proper prosecution
and completion of work. Lights located at false work tower to be provided by
contractor.
Temporary barricades and guard lights
provided by contractor
through arrangements with local utility companies. All expenses paid by the
contractor
Temporary water, power and telephone facilities
no advertisements to be displayed without architect’s
approval.
Temporary signs
provide proper access
Temporary roadways
Section 5
Protection of work and owner’s property
Section 6
Labor, work and payments
The architect may recommend withholding of payment on any of the following:
• defective work not remedied
• reasonable evidence indicating probable filling of claims
• failure of contractor to make payments to sub-contractor or for material and labor.
• reasonable doubt that the contract can be completed for the balance then unpaid
• damage to another contractor
The contractor shall submit the following before final payment is made:
• certificate of final building occupancy
• certificate of final inspection of utilities
• original and 3 sets of prints of “as-built drawings “ of electrical, sanitary, gas, telephone, and mechanical works
• 3 copies of directory of panel boards and list of circuits.
• 3 copies of instructions and manual for operating fixtures and equipment.
• 3 copies of keying schedule
• Guarantee bond equivalent to 30% of the contract price covering a period
of 1 year after the final acceptance of the work.