Section 1 Ure Flashcards

1
Q

What is the rated capacity of the positive displacement meter on the R14C fuel servicing module

A

600 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

At what flow rate can fuel be pumped through one 2inch over wing nozzle on the R14C fuel servicing module?

A

100 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What component on the collapsible coated fabric fuel tank allows for removal of water?

A

Tank vent pipe assembly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How far from the parking apron must the tanks be placed if the ABFDS is used to resupply the R14C fuel servicing module?

A

100 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What must be taken into consideration when determining a convenient location to set up the R14C fuel servicing module?

A

Type of aircraft to be serviced

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Hearing protection must be worn when working within how many feet of the R14C operation?

A

50 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What temperature must the engine of the R14C fuel servicing module reach during idle before you can increase the throttle setting?

A

120 F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the minimum operating oil pressure for the R14C fuel servicing module at normal operating speed?

A

40psi

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

When placed in the low mobility position what is the maximum ramp angle the R 14C can negotiate?

A

15 degrees

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What is the purpose of the float valve on the R 22 pump assembly?

A

To fill the engine tank

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

When setting up the R 22 how many sections of 25 foot hose should be used to connect the R22 to the FFU-15E?

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

After starting the R 22 how long should the engine be allowed to idle before increasing the throttle setting?

A

5 min

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

At what flow rate is the FFU-15E filter separator capable of filtering petroleum fuels?

A

600 gpm

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How many elements are installed in the FFU-15E filter separator?

A

6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How often should the filter separator elements in the FFU15E be replaced?

A

WHen the DP reaches 20 or every 3 years, whichever comes first

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The canisters in the FFU-15E filter separator are constructed of

A

Aluminum

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

When setting up the FFU-15E how should it be placed in relation to the dike wall?

A

25 feet in front and centered on the dike wall

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

When preparing the FFU-15E for shipment, complete all of the following except

A

Remove filter elements

19
Q

The TPI-4T-4A additive injector is capable of simultaneously injecting how many additives?

20
Q

What type of meter is installed on the TPI-4T-4A additive injector?

21
Q

When setting up the TPI-4T-4A additive injector where should the corrosion inhibitor and static dissipater additive tanks be placed?

A

On top of the injector cage.

22
Q

When must the injectors on the TPI-4T-4A be purged of all additives?

A

When the unit will be inoperative for more than 72 hours

23
Q

What ppe is required when calibrating the TPI-4T-4A?

A

Safety goggles

24
Q

All of the following things should be considered before starting a calibration run with the TPI-4T-4A except what?

A

Amount of additive will be injected

25
The second purpose of the PMU-27M self-priming pump is refueling
Small aircraft
26
What is the rated capacity of the PMU-27M self-priming pump?
50 gpm
27
How many filter elements are installed in the PMU-27M filter separator?
3
28
To facilitate priming, the PMU-27M self-priming pump is provided with a priming
Valve
29
The 117 MRSP kit is equipped with how many 500 gallons sealed drums
4
30
When preparing the PMU-27M for shipment complete all of the following except
Remove filter elements
31
How many tanks are used when the ABFDS is installed on a C-5?
10
32
What ABFDS Component tank Component prevents the buildup of fuel vapors inside the aircraft?
Automatic vapor eliminator
33
On the ABFDS How many wafers valves make up the refuel/defuel manifold of each pumping module
4
34
What is the rated capacity of the filter separator on the ADDS
300 gpm
35
What fuel bladder component is used for removing water from the bladder?
Vertical vent pipe
36
When positioning 50,000 gal fuel bladders Inside a diked area how far apart must the tanks be from each other?
6 feet
37
Sealing clamps used for emergency repair of fuel bladders come in what sizes?
3 inch, 5 inch, 7 1/2 inch
38
The FAM cart is capable of servicing up to how many receiver aircraft at one time?
3
39
The FAM cart engine can run on all of the following fuels except
Gasoline
40
For air shipment the inner tanks of empty cyrotainers of pressurized with dry nitrogen gas at a positive pressure of
15 to 25 psi
41
Fuels personnel identify the tank vent valve by using a locally manufactured
Round aluminum disc
42
During shipment the cryotainer inner tank pressure should not exceed what Maximum psi reading?
40 psi
43
Which fuels can be used to operate the engine on the R14C fuel servicing module
Jet fuel and diesel