Section 1 Review Flashcards

1
Q

Briefly described the three major components of the unit eight fire protection system 

A

Fire zones, defines the specific fire protection needed for the area.

Fire area, associated with a building or piece of equipment.

Main fire protection control system, system that controls the CO2, alarms, and deluge

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Where are the main and remote auxiliary fire protection panels located at unit unit eight

A

Main control center and local control centers 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

List the equipment and compartments protected by CO2

A

GT 81,82 and 83 load compartment, turbine compartment, auxiliary compartment 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

State the concerns caused by low nitrogen system pressure alarm

A

Nitrogen is used to activate Deluge system on ST 84, transformers and cable trays and North tank farm control valves. 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Explain how each firewater pond level is controlled

A

One-manual gates, and float system
Two-canal level
Three- to be pumped from pond one or two 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

State the normal operating pressure for firewater system

A

150 psi 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

List the six main AC voltages that will be produced and utilized by unit unit eight

A

15 KV, 18kv, 5kv, 120V, 240V, 480V

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

List the 6 main AC voltages that will be produced and utilized by unit unit eight

A

5kv, 15kv, 18kv, 480v, 240v, 120v

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Defined the term step up transformer

A

Takes 15 KV and steps it up to 138 KV low to high

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

State the operating units at the oyster Creek site

A

CRW, LHC9, LHC8, phenol, PDH, vinyl, Power 8, braskem

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

State what services is provided by B breaker on 15 KV system

A

It is a service breaker that reduces voltage to supply plant equipment 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

List the hazards associated with clearing, electrical switch gears

A

Arc flash, shock, grounding, pinchpoints 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

List the device that is used to measure, bearing and winding temperatures in a high voltage pump motor

A

RTD resistance temp detectors 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

State whom must be contacted before operating or clearing any 15 KV switch gear

A

Power dispatch extension, 2575 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

State the three operating positions that a five KV breaker can indicate while in its housing

A

Test position, connected, disconnected

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

State the approved electrical protective equipment required when operating switch gears

A

Flash hood, flash suit, gloves, hardhat, side shields

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

State who may issue an ESWP at the Unit eight Plant

A

Train documented personnel by I&E supervisor 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

State the main purpose of a positive nitrogen purge on a transformer

A

Keeps out air and moisture

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

List the two main purposes of a transformer

A

Steps up or down voltages also it’s used to isolate power from source

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

List, the purpose and location of the pressure relief device used on a transformer

A

Top of transformer and used to relief, gas pressure 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

Who will issue an order to Raise or lower the settings on the load tap chargers used when the 15 KV 138 KV transformers 

A

Power, dispatch

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

List the purpose of protective relay

A

Used to protect personnel from electrical shock during abnormal conditions, and used to protect equipment

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

List the purpose of an 86 lockout relay

A

Trips/alarms and locks out more than one breaker. It has to be manually reset when electrically tripped. 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

State the building location of the two 125 V DC distribution buses

A

OC 882 local 

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
List the major components of the 125V DC system
2 125 VDC buses, two sets of batteries, three battery chargers 
26
List the primary voltage for the chargers and the location where power originates from
MCC switchgear and 480 VAC 
27
State the type of cooling medium used to cool the stator windings of each generator
Hydrogen
28
State the type of gas used for arc suppression in the 15 KV breaker
SF-6 sulfur hexa fluoride
29
List whom may issue in order to raise or lower the tap chargers on the 15 KV 138KV distribution transformer
Power, dispatch
30
List who will obtain a switching request for the 15 KV generator before the L breaker can be closed to connect to the tie line system
Equipment owner
31
List the equipment that utilizes 5KV in unit eight
Circulation pumps, high-pressure boiler feed water pumps, 5KV to 480 V transformers, starting motors 
32
Explain the purpose of five KV tiebreakers
Used to tie buses together when our transformer is an outage, or when under voltage is detected on a transformer, and when a transformer needs to be isolated 
33
List the PPE required when working on the 48 V DC battery system
Mono goggles, apron, gloves, boots, face shield, baking soda, or water for neutralizing solution 
34
State the purpose for using a job procedure to place the UPS and service and take it out of service
To ensure nothing is missed and the UPS system is put back online properly. Not doing so can result in trip turbin, or damage to equipment. 
35
List three types of  alarm displays in the base alarm window
Alarm history, alarm list, acknowledged alarm 
36
State why a technician should investigate and clear a ground when they receive a ground alarm
The grounding system is to remove any ground faults. If one ground comes in and another comes in before the first is reset, it could cause high current, resulting in damage to equipment/personal injury. 
37
Name five trips that will shut down boiler feed water pumps
Low lube oil pressure, low feed water flow, high vibration, hihi thrust bearing temp, emergency stop switch 
38
Explain the main purposes of redundancy
Back up in case one fails, arbitrary voting process of the computer 
39
State what solution is used to calibrate a pH analyzer
Buffer solution
40
State what is actually measured by a pH analyzer
Acidity and alkalinity of a solution 
41
State which part of the electrical generator at unit eight contains the DC magnetic field
Rotor field windings 
42
State how the generator rotor receives its DC voltage when rotating at 3600 RPM
By the use of brushes and slip rings on shaft 
43
State the location of breaker L840
OC 872 
44
State the type of gas used in 18 KV breaker for arc suppression
SF-6 Selalexa fluoride 
45
State when the inspection plates may be removed from the isolated phase bus ducts
Only when deenergized 
46
Explain the term reverse power
When energy starts to flow into the generator instead of out of it, the generator starts to motorize 
47
State how the generator field receives the DC voltage while rotating
Rotor receives the DC voltage from a diode ring. the DC voltage is delivered to the field windings of the generator through a set of rotor leads 
48
State the building location that houses the exciter cubicle for steam turban ST 84
 OC883 local/OC872
49
State how electricity is produced in the generator
The turbine spins the shaft which rotates the armature. The armature spins inside the stator, this produces electrical current through the copper wiring.
50
List the utilities on the utility system that will be entered into Unit 8
Clarified river water, HCL, condensate, caustic, fuelgas, nitrogen, potable, water, firewater 
51
List the utilities on the utility system that will be exiting unit eight
Condensate, 90 pound steam, 300 pound steam, 740 pound steam, 1550 pound steam, and electricity 
52
List the unit that will receive 1550 pound steam from unit eight
LHC eight
53
Explain the purpose of a flag on a relay
Shows relay has been activated or tripped
54
Explain what must be done before any relay flag is reset
Notify Control Center, log it in, call power dispatch 
55
State the reason why an accurate calibration is necessary for every metering device
To provide an accurate indication of process variables, and provide accurate accountability of utilities used 
56
Explain what happens with the PRV system in the event the steam turbine trips 
The PRV’s will open and control pressure of steam header until steamer is back up 
57
List the power plant source of 90 pound steam
HRU, 90 pound extraction, PRV’s
58
Name two sources of 1550 pound steam to 740 reduction
East and West 1550 to 740 PRV‘s 
59
What is the flow capacity of the 1550 to 740 reduction station?
600,000 pounds per hour
60
What plant does the 740 pound header supply? What is the pressure reduced to when it reaches its destination?
LHC9 740-300
61
Why must we notify industrial gases before cutting back on 740 pound steam?
So they can cut back their process we notify industrial gases in plant a
62
Describe the internal design of D 8001ABCD
Lined carbon tanks with distribution headers and cation beds 
63
State the function of TK 8003
Neutralization tank used to neutralize water before sending to outfall 
64
Describe the internal design of TK 8003
Open to atmosphere tank lined carbon tank with agitator 
65
State the alarms associated with the following nitrogen, potable, water, sewer, and river water
Nitrogen- low pressure, potable water- pump status low/high pressure, sewer- high-level D-100 river water- low pressure
66
Explain the difference between padding with nitrogen and purging with nitrogen
Nitrogen padding- constant flow of nitrogen to a tank or vessel, to keep out oxygen Nitrogen purging- trying to remove moisture 
67
Locate the continuous blow downs on each drum and ovation graphic
Blue box on right side of screen on LP and HP drum
68
State the function of the V8001 and V8002
V8001 new oil V8002 used oil
69
Describe the hazards of pumping contaminated lube oil back into the turbine reservoir
Could damage rotating equipment, bearings or plug lube coolers 
70
Describe why the oily water separator will not process ethylene glycol
Ethylene glycol blends with water soluble 
71
There is a leak on the chilled waterline just before it goes into OC 802’s air handler state your action
Block in the leak or shut down the system
72
List the parameters for the following sample results. Cooling tower pH- Cooling tower conductivity- High-pressure boiler pH- High pressure boiler conductivity- Wastewater total suspended solids-
7.5-7.8 Less than 4500 9.1-9.5 30-150 0-50
73
Explain the purpose and or function of the nitrogen being used on the following equipment V8001 new oil tank- Unit 8 fuel gas area- P-8101A hp boiler feed water pump- T-81 transformer- ST84 lube oil deluge- GT-81 hydrogen cabinet- Combustion monitors- 
Isolation pad Purge Isolation pad Isolation pad Deluge dump Cabinet purge Purge
74
What is the nitrogen pressure before and after unit eight metering station?
160 to 80 psi