Section 1-4 Flashcards
True or False? All A/C can land if the ground slope is between 8 and 15 degrees.
False
True or False? Establish Control facilities is the third step when establishing a HLZ?
False
True or False? You must use the 10:1 obstacle ratio for the left/right sides of your PZ/LZ.
False
True or False? The clock method is always from the signal person perspective?
False
True or False? If prevailing winds are 10 knots or less the A/C can land into a crosswind.
False
Name two of the four information systems.
Army Battle Command System, Combat Net Radios, Blue Force Tracker, and Nett Warrior.
What is a mission of the AH-64?
Reconnaissance, Anti-Armor (Primary), Close Air Support, and Air to Air Combat.
What is a bump plan?
Ensure the most essential personnel & equipment arrive on time at the objective.
What is the primary use of the Sked Rescue System?
Ground / Water Evacuation
What is a mission of the AH-6J/ MH-6J?
Close Air Support, infiltration, and exfiltration for Special Operations Forces.
What is the flight time for the CH-47 D/F Chinook?
2hrs 30min
True or False? The primary missions for the UH-60 A/L/M is Air Assault & Air Movement and Casualty Evacuation.
True
What is the allowable cargo load (combat equipped troops) for the UH-60 A/L/M without seats?
16 PAX
True or False? Air Assault units are the only units that are capable of executing an Air Assault Operation.
False
A __________ is defined as personnel and equipment designated to be moved by a specific aircraft.
Chalk