Second Step Flashcards
What are we allowed to operate on a PMH?
Gang operated switch handle
On a live front pad mounted transformer, what kind of barriers do you install once cables are stood off?
Transformer barrier
What are the steps for grounding dead break elbows?
- Attach grounds to bus wire
- Test
- Ground
What are the steps for grounding live front?
- Check for barriers
- Test
- Install grounds to standoff
- Ground
Which spiking tool must you support?
Hydraulic cutter spike
Who is allowed to operate load break elbows?
QEW or QP supervised by QEW
Why do you clean the elbow/bushing?
To keep interface from becoming contaminated
What is the purpose of the safe switching triangle?
To ensure correct location
You have removed a load break elbow to a grounded standoff. What step is next?
Cover with a candled elbow
What do you do if you expect an elbow to be de-energized but the tester reads voltage?
Notify PIC
What is the first thing you do when arriving at a switch location?
Check surroundings
What is a cocktail shaker used for?
Stress cones
When testing secondary de-energized, what must you use?
Shunts and leather gloves
What grounds must PIC count?
Phase to phase grounds
How do you attach a tester to a hotstick?
Hold tester and spin hotstick
What is a nontest for?
Hot work/rubber gloving. If there is a fault on the line, the device won’t close in. We don’t use non test in underground because we don’t work it hot.
Where do you place the man on line tag?
Control or operating device of each clearance limit
Line is grounded and work location is in a splice box. Cannot visually identify the cable, what must you do?
Spike the cable
What must be in place before you can ground?
Barriers
You have grounded a dead front transformer and have attached grounds to the bus wire. What do you do next?
Test dead
What side of traffic is the preferred placement of a riser?
Opposite side of traffic
What size conduit do we install?
For the next largest size of cable
What are you removing when wire brushing wire?
Oxidation
Where do you find the size of wire you will need for the job?
Job packet