Scope of Work Flashcards

1
Q

100 Sales Floor

A

Electrical; Wall finishes; Patch and repair damaged gyp board and paint to ceiling or structure; Install PS7 wainscot and DB5 base; Paint CMU; Paint vertically mounted HVAC grills to match adjacent walls; Floor finishes; Replace ceiling tile; Clean and paint (P8) ceiling grid; Remove any unused electrical drops throughout sales floor; Columns; Replace damaged outlets, non-almond to match existing color, replace almond with white; Replace customer visible almond outlets with white; Replace damaged and customer visible outlet cover plates with brushed stainless steel, including blank plates and columns; Clean or replace damaged diffusers and returns as required; Replace damaged parts of impact doors; Replace all damaged joints; Fire Sprinkler System; 100 Sales Floor Punch List; Z. Final Sign-off - 100 Sales Floor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

101 GM Vestibule

A

Electrical; Walls: Paint brick P209 wainscot to 4’0”, P131 from 4’-0” to 10’-0” AFF; Floor finishes; Replace ceiling tile; Clean and paint ceiling grid; Replace damaged outlets, non-almond to match existing color, replace almond with white; Replace customer visible almond outlets with white; Replace damaged and customer visible outlet cover plates with brushed stainless steel, including blank plates; 101 GM Vestibule Punch List; Z. Final Sign-off - 101 GM Vestibule

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

105 Courtesy Desk | Customer Service

A

Floor finishes; Re-laminate front face and side faces of existing casework. Install new wall guard, infill toe kick, and install base; Laminate countertop: Replace countertop with new SS countertop; Replace damaged outlets, non-almond to match existing color, replace almond with white; Replace customer visible almond outlets with white; Replace damaged and customer visible outlet cover plates with brushed stainless steel, including blank plates; Clean or replace damaged diffusers as required; Install monitor support bracket; Install horizontally oriented digital display monitor; Reinstall cart rail at existing location; 105 Courtesy Desk | Customer Service Punch List; Z. Final Sign-off - 105 Courtesy Desk | Customer Service

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

107 Cash Office

A

Paint P131 to ceiling; Patch and repair walls; Ceiling: Clean and paint (P131) ceiling grid; Columns; Paint pipe support counter legs P162; Sand and varnish oak on countertop; Z. Final Sign-off - 107 Cash Office

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

119 AP Office

A

Electrical; New Walls: Paint P131 to ceiling; Floor; Ceiling; Replace ceiling tile; Clean and paint (P131) ceiling grid; Z. Final Sign-off - 119 AP Office

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

126 Seasonal Shop

A

Patch and repair damaged gypsum board walls and paint to ceiling or structure; Install PS7 wainscot and DB5 base; Paint CMU; Floor finishes; Replace ceiling tile; Clean and paint (P131) ceiling grid; Columns; Replace damaged outlets, non-almond to match existing color, replace almond with white; Replace customer visible almond outlets with white; Replace damaged and customer visible outlet cover plates with brushed stainless steel, including blank plates and columns; Clean or replace damaged diffusers and returns as required; Replace damaged parts of impact doors

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

148 Security

A

Paint P131 to ceiling; Replace ceiling tile; Clean and paint (P8) ceiling grid; Replace damaged outlets and outlet cover plates; Z. Final Sign-off - 148 Security

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

151 Breakroom

A

Demo; Plumbing; Electrical; Wall finishes; Floor; Ceiling; Columns; Millwork; Re-laminate front face and side faces of existing damaged casework; Refurbish SS countertop to like new condition; Replace countertop with SS countertop; Replace damaged outlets, non-almond to match existing color, replace almond with white; Replace damaged cover plates with brushed stainless steel, including blank plates; Clean or replace damaged diffusers and returns as required; 151 Breakroom Punch List; Z. Final Sign-off - 151 Breakroom

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

153 UPC | Storage

A

Walls: Paint P131 to ceiling; Replace ceiling tile; Clean and paint (P131) ceiling grid; Columns; Paint pipe support counter legs P162; Sand and varnish oak on countertop; Replace damaged countertop to match existing; Z. Final Sign-off - 153 UPC | Storage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

155 Electronics Storage

A

Paint P131 to ceiling; Replace ceiling tile; Clean and paint (P8) ceiling grid; Replace damaged outlets and outlet cover plates; Z. Final Sign-off - 155 Electronics Storage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

157 Hallway

A

Electrical; Walls ; Columns; Replace damaged outlets and outlet cover plates; Z. Final Sign-off - 157 Hallway

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

158 Janitor

A

Wall finishes; FRP on walls; Replace mop sink if broken or cracked; Z. Final Sign-off - 158 Janitor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

160 Claims

A

Walls: Paint P131 to ceiling; Replace ceiling tile; Clean and paint (P131) ceiling grid; Columns; Paint pipe support counter legs P162; Sand and varnish oak on countertop; Replace damaged countertop to match existing; Z. Final Sign-off - 160 Claims

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

161 Corridor

A

Walls: Paint P162 wainscot to 4’-0” AFF, and P131 from 4’0” AFF to ceiling; Ceiling: Clean and paint (P131) ceiling grid; Columns; Replace damaged outlets and outlet cover plates; Z. Final Sign-off - 161 Corridor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

163 Alcove

A

Walls; Patch and repair gyp board walls; Paint all walls P209; Install PS7 wainscot and DB5 base; Demising wall on sales floor; Floor finishes; Clean and paint (P8) ceiling grid; Columns; Replace damaged outlets and outlet cover plates; Z. Final Sign-off - 163 Alcove

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

167 Family Restroom

A

All water closets and urinals are to be temporarily removed for finish installation and then replaced in the same location; Wall finishes; Floor finishes; Ceiling: Clean and paint (P131) ceiling grid; Plumbing; Electrical; Demo; Replace all outlets with white; Replace all cover plates with brushed stainless steel, including blank plates; Clean or replace damaged diffusers and returns as required; Replace damaged flush valve; Clean and repair water closet or urinal. Replace if unable to restore to like new condition; 167 Family Restroom Punch List; Z. Final Sign-off - 167 Family Restroom

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

168 Storage

A

Paint P131 to ceiling; Replace ceiling tile; Clean and paint (P8) ceiling grid; Replace damaged outlets and outlet cover plates; Z. Final Sign-off - 168 Storage

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

172 Training Room

A

Wall finishes; Replace ceiling tile; Clean and paint (P131) ceiling grid; Paint pipe support counter legs P162; Replace damaged countertops; Columns; Replace damaged outlets, non-almond to match existing color, replace almond with white; Replace customer visible almond outlets with white; Replace damaged and customer visible outlet cover plates with brushed stainless steel, including blank plates; Clean or replace damaged diffusers and returns as required; Z. Final Sign-off - 172 Training Room

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

178 GM Receiving

A

Wall finishes; Ceiling; Replace mop sink if broken/cracked; Z. Final Sign-off - 178 GM Receiving

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

179 Stockroom

A

Electrical; Wall finishes; Ceiling; Replace mop sink if broken/cracked; Z. Final Sign-off - 179 Stockroom

21
Q

180 Mezzanine

A

Demo; Mechanical; Electrical; Patch and repair gyp board walls; Replace damaged wainscot; Ceiling; Z. Final Sign-off - 180 Mezzanine

22
Q

183 Management Office

A

Walls: Paint P131 to ceiling; Replace ceiling tile; Clean and paint (P131) ceiling grid; Columns; Paint pipe support counter legs P162; Sand and varnish oak on countertop; Replace damaged countertop to match existing; Z. Final Sign-off - 183 Management Office

23
Q

184 Mother’s Room

A

Walls; Floor finishes; Ceiling; Columns; Fire Sprinkler System; Z. Final Sign-off - 184 Mother’s Room

24
Q

201 Manager’s Office

A

Paint P131 to ceiling; Floor; Replace ceiling tile; Clean and paint (P8) ceiling grid; Paint pipe support counter legs P162; Sand and varnish oak on countertop; Replace damaged countertop to match existing; Z. Final Sign-off - 201 Manager’s Office

25
Q

300 Pharmacy

A

Demo; Electrical; Mechanical; Plumbing; Fire Sprinkler System; Dust Wall; Paint all walls P131 semigloss. Refinished modular walls.; Install base; Omit new plastic base B9 behind pharmacy racks; Repair damaged walls both interior and exterior; Remove existing carpet, prep surface for new carpet; Install carpet and transition strip; Replace all existing ceiling tile with ACT3; Clean and paint (P131) ceiling grid; Clean existing light lenses, security globes, sprinkler heads and HVAC fixtures to remain; Casework: Install modular millwork; Walls; Paint exterior walls P209; Install new plastic laminate PS7 and plastic base DB5; Interior elevation; Floor finishes; Ceiling finishes; Install digital display monitor; Side Counter Elevation; Interior Elevation; Exterior Elevation; 300 Pharmacy Punch List; Z. Final Sign-off - 300 Pharmacy

26
Q

301 Pharmacy Toilet

A

Clean walls; Install new flooring; Install new base; Paint ceiling P131; Clean existing light lenses, sprinkler heads, and HVAC fixtures to remain

27
Q

303 Health Services Room

A

Paint all walls P131 semigloss. Refinished modular walls.; Install base; 48’ high wainscot PS7 on all walls; Remove existing finishes and prep surface for new LVT2P; Install transition strips; Ceiling installation; Millwork

28
Q

501 Garden Center

A

Electrical; Walls; Floor: Powerwash existing concrete; Ceiling; Install new wind screen; Install shade cloth to match P134E; Repair/replace flashing at metal canopy; 501 Garden Center Punch List; Z. Final Sign-off - 501 Garden Center

29
Q

700 Optical Sales

A

Paint all walls P207; Install new base DB5; Match adjacent wall texture for new walls; Remove all PVC flooring; Install transition strips; Replace ceiling tile; Clean and paint (P131) ceiling grid; Millwork

30
Q

701 Adjustments

A

Paint all walls P207; Install new base DB5; Remove all PVC flooring and replace with LVT2P; Install transition strips; Replace ceiling tile; Clean and paint ceiling grid; Clean air grilles and diffusers, security globes, and sprinkler heads. Replace any damaged items.; LED light replacement; Millwork

31
Q

703 Pretest | 705 Exam 1

A

Paint all walls P207; Replace damaged plastic base; Repair damaged walls; Floor: Install transition strips; Replace ceiling tile; Clean and paint ceiling grid; Clean air grilles and diffusers, security globes, and sprinkler heads. Replace any damaged items.; LED light replacement

32
Q

946 Pickup Storage

A

Mechanical; Wall finishes; Floor finishes; Ceiling; Replace ceiling tile; Clean and paint (P131) ceiling grid; 946 Pickup Storage Punch List; Z. Final Sign-off - 946 Pickup Storage

33
Q

Cart Corrals

A

Cart corral signage; Install (7) new cart corrals; Remove existing cart corrals; Install trash cans; Z. Final Sign-off - Cart Corrals

34
Q

Customer Restrooms (Women 166 | Men 165)

A

All water closets and urinals are to be temporarily removed for finish installation and then replaced in the same location; Wall finishes; Floor finishes; Ceiling: Clean and paint (P131) ceiling grid; Plumbing; Electrical; Demo; Replace all outlets with white; Replace all cover plates with brushed stainless steel, including blank plates; Clean or replace damaged diffusers and returns as required; Replace damaged flush valve; Clean and repair water closet or urinal. Replace if unable to restore to like new condition; Front Restrooms (Women 166 | Men 165) Punch List; Z. Final Sign-off - Front Restrooms (Women 166 | Men 165)

35
Q

Diamond Plate

A

Remove existing column wrap; Install diamond plate protection rail; Z. Final Sign-off - Diamond Plate

36
Q

Exterior Sign

A

Demo Existing Signage; Install New Signage; Resurface/Paint Surface; Z. Final Sign-off - Exterior Sign

37
Q

FET

A

Register Move; Self Checkout BullPen; Grid Wall; Power Poles; Z. Final Sign-off - FET

38
Q

Fitting Room

A

Spot, replace, or repair floor as required; Caulk mirrors and seats; Anchor unit to floor; Z. Final Sign-off - Fitting Room

39
Q

Grab & Go Cases

A

Electrical; Plumbing Trench; RCU Install; Refrigeration Chase; Refrigeration Piping; Start Up; Z. Final Sign-off - Grab & Go Cases

40
Q

Miller Zell Signage Install

A

Phase 1; Phase 2; Z. Final Sign-off - Miller Zell Signage Install

41
Q

New OGP Door Opening | Stanley

A

Install air curtain; Stanley door; Electrical; Steel work; Concrete; Security roll down door; Window tint; Z. Final Sign-off - New OGP Door Opening | Stanley

42
Q

PTE (Paint Exterior)

A

East Elevation; Gas Line Painting; JibAccess Ladder Painting; North Elevation; South Elevation; West Elevation; PTE (Paint Exterior) Punch List; Z. Final Sign-off

43
Q

PTI (Paint Interior)

A

Column Painting; East Interior Elevation; North Interior Elevation; South Interior Elevation; West Interior Elevation; PTI (Paint Interior) Punch List; Z. Final Sign-off

44
Q

SSM (Stop Signs and Markings)

A

Parking Lot Directional Signage; Markings; Stop Signs; Z. Final Sign-off - SSM (Stop Signs and Markings)

45
Q

Site SECP

A

Paint Bollards; Paint Light Pole Bases; Parking Lot Seal Coating; Parking Lot Striping; Pick-Up Parking; Z. Final Sign-off - Site SECP

46
Q

VCT Conversion

A

Pharmacy carpet tile; Restrooms - tile; Lower clean-outs to match elevation of exposed floor; Removal and replacement of refrigerated case protection; Removal and/or replacement of thresholds at automatic sliding doors by vendor; Z. Final Sign-off - VCT Conversion

47
Q

Vestibule

A

Repair/infill concrete slab as needed at removal of storefront; Rubber flooring; Mechanical

48
Q

Vision Center

A

Fire Sprinkler System; Plumbing; Mechanical; Vision Center Punch List; Z. Final Sign-off - Vision Center